Packet · Dec 10, 2024
Township Council Meeting — Packet
Preserved file SHA-256
7103bae55cfad555ffbc71f79fc94d646acd5e97bb0ad314f610ac4825e4d443Indexed text · page 59
Show all pagesTownship of West Orange NJDOT Safe Routes to School (SRTS) Design Assistance Program SRTS ‐ 2022 ‐ Pedestrian Improvements PRELIMINARY ENGINEERING FEE SUMMARY FOR GPI SURVEYING SERVICES November 13, 2023 Activity Maximum Hourly Rate: Average Hourly Rate: Activity No. ‐ 3020 3025 Conduct Topographic Survey Prepare Base Maps Total Hours Total $ $120.00 $103.48 0 10 10 $75.30 $75.30 0 25 80 $64.00 $62.23 0 60 $47.20 $45.73 0 100 0 Technician/C ADD Total Operator Hours $54.00 $54.00 0 0 100 295 300 390 20 $2,069.60 105 $7,906.50 60 $3,733.80 100 $4,573.00 400 $21,600.00 Project Manager Professional Senior CADD Senior Party Surveyor Operator Chief Total $0.00 $16,624.10 $23,258.80 $39,882.90 685
File revisions (1)
- Sep 29, 2026
7103bae55cfa30,423,597 bytes