Town CrierWest Orange, New Jersey
← Back to search

Packet · Dec 10, 2024

Township Council Meeting — Packet

Preserved file SHA-2567103bae55cfad555ffbc71f79fc94d646acd5e97bb0ad314f610ac4825e4d443

Indexed text · page 60

Show all pages
Page 60

FIXED FEE CALCULATION PROJECT: CONSULTANT: AGREEMENT OR CAM NO. PREPARED BY: DATE: SRTS-2022 Township of West Orange Pedestrian Improvements Preliminary Engineering Greenman-Pedersen, Inc. (GPI) Dale Foster 16-Jul-24 EVALUATE PROJECT SPECIFICS: Directions: Prime Consultant will use Total Project Design Cost (or Task Order Design Cost) for the SIZE criteria Each Subconsultant will assign points for SIZE, COMPLEXITY, DURATION, & DEGREE OF RISK based on its specific project tasks. SPECIFICS CRITERIA SIZE: COMPLEXITY: DURATION: DEGREE OF RISK: POINTS RATING SMALL - Total Fee (Project Design Cost) < $1,250,000 15 15 LARGE - Total Fee (Project Design Cost) > $1,250,000 20 SIMPLE - Limited Scope of Work; Deck Patching, Resurfacing, Restoration, Concept Development, Studies, Surveys, Landscape, Inspections 10 STANDARD - Moderate Scope; Rehabilitation, New, or Reconstruction 15 COMPLEX - Multi-disciplined, Highly Specialized, or Major Unusual 20 STANDARD - Appropriate Schedule 15 AGGRESSIVE - Designers Schedule Reduced > 10 % 20 LEVEL 1 - Low Risk of Claims; Limited Scope of Work, Deck Patching, Resurfacing, Restoration, Concept Development, Studies, Surveys, Landscape, Inspections 20 LEVEL 2 - Average Risk of Claims; Standard Complexity or Level 1 with High Public Exposure 30 LEVEL 3 - High Risk of Claims; Hazardous, Experimental, or Bonus/Penalty Clauses 40 TOTAL RATING = 15 15 30 75 CALCULATE FEE: PROJECT SPECIFICS FACTOR (Total Rating /100) = 0.75 FEE FACTOR ( Project Specifics Factor x 0.30) = 0.225 DIRECT LABOR COSTS $ 93,955.94 TOTAL FEE (Direct Labor Costs x Fee Factor) = $ 21,140.09 Fixed Fee Calculation Page 1 Revised 08/12/2015

File revisions (1)