Packet · Apr 8, 2025
Township Council Meeting — Packet
c984b146cc43ab17fb0ec78e8acf735f53f8e64ae67128a1e7fa7d20ac6381fdIndexed text · page 113
Show all pagesAuthorization Down Payment $ 1,700,000 (including the $517,907 DOT Grant) $ 1,182,093 $ 0 10 years (iv) Improvements and repairs to the entire lengths or portions of, as applicable, South Valley Road, Union Street, Nassau Street from South Valley Road to Township limits and Wheatland Avenue, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; $ 2,510,000 (including the $950,000 DOT Grant) $ 1,560,000 $ 0 10 years (v) Improvements and repairs to the entire lengths or portions of, as applicable, Helen Avenue, Lawrence Avenue, Florence Place, and Lowell Avenue, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; and $ 2,000,000 (including the $498,984 DOT Grant) $ 1,501,016 $ 0 10 years $ 742,560 $ 37,440 $6,714,669 $ 48,440 Description Appropriation Walker Road, South Valley Road, and Rooney Circle, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; (iii) Improvements and repairs to the entire lengths or portions of, as applicable, Morris Road, Sussex Road and Hunterdon Road, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; $1,000,000 DOT Grant) (vi) Section 20 Expenses. $ TOTALS: (b) 780,000 $10,030,000 Useful Life The improvements and purposes set forth in Section 3(a) above shall also include, as applicable, all engineering and design work, surveying, construction management services, construction planning, preparation of plans and specifications, permits, bid documents, construction inspection and contract administration, environmental testing and remediation, and all work, materials, equipment, labor and appurtenances necessary therefor or incidental thereto. 3 #95204340.1 168182.012
File revisions (1)
- Sep 29, 2026
c984b146cc433,758,624 bytes