Town CrierWest Orange, New Jersey
← Back to search

Packet · Apr 8, 2025

Township Council Meeting — Packet

Preserved file SHA-256c984b146cc43ab17fb0ec78e8acf735f53f8e64ae67128a1e7fa7d20ac6381fd

Indexed text · page 177

Show all pages
Page 177

Table 1 Green Infrastructure BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity Stormwater Minimum Best Runoff Quality Stormwater Separation from Management TSS Removal Runoff Groundwater Seasonal HighPractice Rate Quantity Recharge Water Table (percent) (feet) Cistern 0 Yes No -- Dry Well(a) 0 No Yes 2 Grass Swale 50 or less No No 2(e) 1(f) Green Roof 0 Yes No -- Manufactured Treatment Device(a) (g) 50 or 80 No No Dependent upon the device Pervious Paving System(a) 80 Yes Yes(b) No(c) 2(b) 1(c) Small-Scale Bioretention Basin(a) 80 or 90 Yes Yes(b) No(c) 2(b) 1(c) Small-Scale Infiltration Basin(a) 80 Yes Yes 2 Small-Scale Sand Filter 80 Yes Yes 2 Vegetative Filter Strip 60-80 No No -- (Notes corresponding to annotations (a) through (g) are found after Table 3) Table 2 Green Infrastructure BMPs for Stormwater Runoff Quantity (or for Groundwater Recharge and/or Stormwater Runoff Quality with a Waiver or Variance from N.J.A.C. 7:8-5.3) Stormwater Minimum Best Runoff Quality Stormwater Separation from Management TSS Removal Runoff Groundwater Seasonal High Practice Rate Quantity Recharge Water Table (percent) (feet) Bioretention System 80 or 90 Yes Yes(b) No(c) 2(b) 1(c) Infiltration Basin 80 Yes Yes 2 15

File revisions (1)