Packet · Aug 12, 2025
Township Council Meeting — Packet
ab06171459d2cd160ed919fd4dd626e257a99dc08cc34aa6ee41212bb73ddee7Indexed text · page 171
Show all pagesExhibit A Page 25 of 66 TA-2023 Washington Street Corridor Improvement Project Phase 2 Township of West Orange Hazardous waste investigations and studies, if necessary, are to be performed by NJDOT and therefore not included in this scope of services. A Design Exception Report is not required and therefore preparation of the same is not included in this scope of services. Modifications will not be required to the existing roadway profile or roadway cross slopes. Roadway improvements will be limited to the curb relocation and associated pavement repair strip. As this is a Township led project, we do not anticipate the need to establish utility funding and therefore this activity is not included in this scope of services. Wayfinding is not included in the project scope. Driveway widths and locations will not be modified. CADD drawings and design will be produced in AutoCAD C3D. Cost Estimate — A copy of the proposed costs for the aforementioned services is attached. We would be happy to discuss this scope of services with you, at your convenience. Thank you for the opportunity to provide professional engineering design services to the Township of West Orange. Sincerely, Greenman-Pedersen, Inc. LK S52 Andrew Cangiano, PEYCME Director of Engineering -Morris Plains Office 301 Gibraltar Drive Suite 2A Morris Plains, NJ 07950 Phone: 973.434.8349 Email: acangiano@gpinet.com
File revisions (1)
- Sep 29, 2026
ab06171459d265,262,401 bytes