Town CrierWest Orange, New Jersey
← Back to search

Packet · Aug 12, 2025

Township Council Meeting — Packet

Preserved file SHA-256ab06171459d2cd160ed919fd4dd626e257a99dc08cc34aa6ee41212bb73ddee7

Indexed text · page 186

Show all pages
Page 186

Exhibit B Page 40 of 66 TA-2023 Washington Street Corridor Improvement Project Phase 2 Township of West Orange Prepare Jurisdictional Limits Maps and Agreements (4100): The project is located within Washington Street right- of-way, which is under the jurisdiction of Essex County. GP! will prepare a jurisdictional map depicting Township and County maintenance responsibilities within the limits of the project after the completion of the construction. It is assumed the Township and County will develop their own form of jurisdictional agreement. Complete Horizontal / Vertical Geometry (4210): GPI will provide for the final development of horizontal and vertical geometry for all new construction. The proposed work includes defining all dimensions as will be constructed and providing station and offset from the project baseline to facilitate construction. Work includes the confirmation and finalization of baseline ties and final grading to be compliant with NJDOT and ADA Standards. GPI will develop final typical sections to detail sidewalk construction and driveway reconstruction. Per existing field conditions, sidewalk will typically be a minimum four-foot in width with a utility/planter strip adjacent to the curb to provide for streetscape elements. The utility strip will be consistent in width as much as possible, but isolated deviations may be required to avoid relocating utility poles or other objects. Conduct Supplemental Surveys (4215): During FD the existing topography will be assessed for any changes or additional needs and a supplemental survey will be performed to make the base mapping and topographic features current. It is assumed that the supplemental survey will be conducted using the control established in the PE phase and that the project limits will not be extended. The base mapping and topographic models will be updated to reflect current field conditions. Please refer to MFS’s Scope of Services and Estimate which is attached for more information. Prepare Final Roadway Plans (4220): GP! will update the plans prepared in Preliminary Engineering in the development of the final roadway plans showing construction ready details and providing necessary adjustments to reflect existing site conditions. This activity includes the development of the following sheets: e Key Sheet e EDOQ e = Typical Section © Plan Sheet Index © Construction Plans

Page 186

ary adjustments to reflect existing site conditions. This activity includes the development of the following sheets: e Key Sheet e EDOQ e = Typical Section © Plan Sheet Index © Construction Plans (1”=20’) © Environmental & SESC Plans and Notes (1”=20’) e Tie Sheet e Traffic Signing and Striping Plans e Traffic Control and Staging Plans e Electrical Highway Lighting Details e Landscaping Plans and Details e Construction Details (including curb ramps) It is assumed that each curb ramp will be detailed on the Construction Detail plan sheets, approximately four (4) per plan sheet. It is anticipated that the construction staging can be accomplished using standard MUTCD and/or NJDOT set ups. It is also anticipated that, as necessary, traffic can be maintained during non-peak periods during the day via alternating traffic through the use of flaggers or through detouring of one direction of travel around the work zone. At the end of the workday the roadway can be restored to typical two-way operation. GPI

File revisions (1)