Town CrierWest Orange, New Jersey
← Back to search

Packet · Oct 28, 2025

Township Council Meeting — Packet

Preserved file SHA-256b02d3a42fed7e2bafeb7d501c62ae37f669a0d9b49d6950bf9ac7ccabff45a3d

Indexed text · page 220

Show all pages
Page 220

Shovels and/or any other equipment as necessary to perform snow removal services in this contract. SNOW PLOWING, REMOVAL AND SALTING: Sidewalks, Paths, Crosswalks, Bus Shelters and Stops Time for payment for snow plowing, removal and salting services will start when the contractor’s equipment and personnel arrive at the Public Works Building at 25 Lakeside Avenue. Time will cease when released by the Superintendent of Public Works or his designee. No traveling time will be paid between the contractor’s site and the Public Works Building. The contractor must notify the Superintendent or his designee prior to leaving the route for any reason. No fuel or equipment will be supplied. Time for payment will not include down time due to failure of contractor’s equipment, rest breaks, or meals. No repairs will be made by Township employees. The Township will not be responsible for any damage to the contractor’s property. Salt will be supplied by the Township. Sidewalks, paths, crosswalks, bus shelters and bus stops shall be kept passable throughout the event. At the conclusion of the event, the contractor shall have a specified amount of time (see below) to clear all sidewalks, paths, crosswalks, bus shelters and bus stops depending upon the snowfall amount during the event. That amount of time is as follows: Event snowfall amount Time allowed to clear all locations after snow ceases Up to 4 inches 4 inches to 8 inches 8 inches to 12 inches 12 inches to 18 inches Over 18 inches 4 hours 6 hours 8 hours 12 hours 24 hours The contractor will be compensated a minimum of 4 hours for equipment and personnel at the hourly rates bid for the equipment and personnel assigned plus a lump sum amount for final cleanup dependent upon the amount of snow per the above schedule and as bid all in the proposal. SALTING: FOR OPTION 1 AND 2 The Township will provide and load salt for the operations covered under this proposal from either the Public Works Building, 25 Lakeside Avenue or the Environmental and Recycling Center, 590 Mt. Pleasant Avenue. The Superintendent of Public Works or his designee will direct the contractors on the use of salt throughout the entire snow/ice event including pre salting and post event salting. CALCIUM CHLORIDE: FOR OPTION 3 This will need to be provided by the vendor and should be calculated in your bid. – Calcium chloride in pellet form: purity

Page 220

including pre salting and post event salting. CALCIUM CHLORIDE: FOR OPTION 3 This will need to be provided by the vendor and should be calculated in your bid. – Calcium chloride in pellet form: purity (e.g., 93% minimum assay for pellets) 40

File revisions (1)