Packet · Oct 28, 2025
Township Council Meeting — Packet
Preserved file SHA-256
b02d3a42fed7e2bafeb7d501c62ae37f669a0d9b49d6950bf9ac7ccabff45a3dIndexed text · page 223
Show all pages30. The contractor shall be responsible for repairing all damage caused by the operation of his/her equipment during the performance of this contract. This includes but is not limited to curbs, sidewalks, lawn areas, driveways, mailboxes and road pavement. All damage shall be corrected by May 1, 2025 and each subsequent May 1 if the contract is extended. 43
File revisions (1)
- Sep 29, 2026
b02d3a42fed746,760,698 bytes