Town CrierWest Orange, New Jersey
← Back to search

Packet · Nov 12, 2025

Township Council Meeting - Wednesday — Packet

Preserved file SHA-256423b048da5b20f556c66289c1c56861d582e5c9fdd14ed5b7bdbd443da5c06dd

Indexed text · page 256

Show all pages
Page 256

within a $0-foot (+/-) right-of-way. Proposals shall be submitted to provide all work required to ptovide a complete design package as generally described onthe enclosed desetiption. The cost of services shall be a complete design and bid package including cost estimates, plans and specifications (twenty copies each} for bidding purposes, detour plans, construction stakeout and cut sheets. This project will be fully funded by - Township of. West Orange. “All plans, specifications and bid documents shall be in conformance with the’ {atest New Jersey Department of ‘Transportation specifications, and, shall be submitted to our office for review prior to finalizing contract documents. Proposals shall be on‘a’ umd sum, basis. Hourly sates shall be submitted with ali proposal for any additional work. Design will consist of utilizing aetial orthophoto maps for preparation of project base maps, A. one+site ‘visit will be conducted to verify and supplement planimetric elements such as roads, inlets, and other -features for the preparation of plans and specification for the milling and resurfacing of the roadways, It is the intent of this office to advertise for bids upon availability of funds from the Township in Winter/Spring 2025. Proposals shall be submitted in writing on or before 10:00 A.M. Thursday, March 28, 2024 to the Department of Engineering, 25 Lakeside Avenue, West Orange, New. Jersey 07052 and shall include a specified completion date or number of days required for completion of the work after approval is granted to ‘proceed. Also, evidenve of proper insuéance shall be submitted by the Township Attorney. A separale proposal for construction inspection and cectification of completion should. also be included if available from your firm. Very truly yours, Zayibeth Carballo Director/Municipal Engincer “2Clei Ene, AN EQUAL OPPORTUNITY EMPLOYER www. westorange.org i i i i i i

File revisions (1)