Packet · Nov 24, 2025
Township Council Meeting — Packet
61a270d401e5ebef2ab5c8bf5571d44088d531804eb623be28d533fabba3a6d4Indexed text · page 139
Show all pagesZalewski Park Improvements Borough of Cliffside Park, New Jersey (Bergen County) CLIENT Borough of Cliffside Park 525 Palisade Avenue Cliffside Park, NJ 07010 CONTACT Joseph Rutch Borough Administrator Borough of Cliffside Park 201-313-2006 CONSTRUCTION COST $430,000 COMPLETION DATE 2016 DISCIPLINES INCLUDED Survey Urban Planning Engineering Design Construction Administration Construction Inspection The Borough of Cliffside Park secured funding from the New Jersey Department of Environmental Protection’s Green Acres Program to provide much needed improvements to Zalewski Park. For this work, the Borough hired Boswell to provide the project visioning, engineering design and construction management services. The intent was to create two distinct play areas for children of different ages providing suitable playground equipment and rubberized play surfaces. Additional improvements included passive recreation space at the request of numerous residents as well as decorative fencing, brick paver walkways, landscaping, a monument area, and a drinking fountain. Boswell ensured that the work was completed efficiently and worked closely with Green Acres staff to secure prompt reimbursement.
File revisions (1)
- Sep 29, 2026
61a270d401e520,766,830 bytes