Packet · Nov 24, 2025
Township Council Meeting — Packet
61a270d401e5ebef2ab5c8bf5571d44088d531804eb623be28d533fabba3a6d4Indexed text · page 153
Show all pagesTownship of West Orange Department of Engineering Land Surveying and Civil Engineering Services – O’Connor Memorial Park Reconstruction Project Section IV – Lump Sum Fee and Hourly Rates Boswell’s lump sum fee for Land Surveying and Civil Engineering Services is: $71,350.00 We propose the following Lump Sum (LS)fee for the services described: Service Category Land Surveying Services Civil Engineering Services Construction Administration Services (submitted as a separate proposal) Combined Total LS for Land Surveying/Civil Eng./Construction Admin. Lump Sum Fee $8,550.00 $62,800.00 $119,000.00 $190,350.00 Hourly Rates for any additional services requested to be provided by the Boswell team beyond the current scope are provided in the attached rate sheet. Page 7
File revisions (1)
- Sep 29, 2026
61a270d401e520,766,830 bytes