Packet · Nov 24, 2025
Township Council Meeting — Packet
61a270d401e5ebef2ab5c8bf5571d44088d531804eb623be28d533fabba3a6d4Indexed text · page 158
Show all pagesTownship of West Orange Proposal for Professional Land Surveying and Engineering Services Re: O’Conner Memorial Park Reconstruction Project October 10, 2025 Our File No. 2025-128 Page 3 3. Civil Engineering Services The work under this phase will include the following services: A. Prepare a Concept Plan for the overall improvements proposed including recommendations on how to best utilize the overall park area; B. Develop three (3) color renderings for review with the Township; C. Design the proposed improvements at the hockey rink and the handball, pickleball and basketball courts, perimeter fencing, retrofitting of existing Musco lights, HMA walkways and relocation of the scoreboard; D. Coordinate and design the Musco Light upgrades; E. Prepare construction details; F. Design the bleachers and concrete pad as well as the drainage improvements as needed; G. Prepare a Plan Set to include but not limited to the following sheets: i. Cover Sheet ii. Existing Conditions/Survey Control Plan iii. Demolition Plan iv. Construction Plan v. Grading and Utility Plan vi. Lighting Plan vii. Electric Plan viii. Soil Erosion and Sediment Control Plan and Details ix. Construction Details H. Prepare a stormwater management report in accordance with NJAC 7:8 and the Township’s Stormwater Control Ordinance; I. Coordinate and submit to HUD to obtain bid clearance; J. Prepare a Bid Package that includes bid plans and construction specifications in accordance with public bidding laws; and, K. Attend four (4) meetings with the Township Officials for the project Kickoff, Preliminary Design, Public Presentation and Final Design. S:\CME COVER & RESUMES\West Orange\2025 O'Connor Memorial Park\25-10-10 - Proposal for O'Connor Memorial Park Reconstruction Project.docx
File revisions (1)
- Sep 29, 2026
61a270d401e520,766,830 bytes