Packet · Nov 24, 2025
Township Council Meeting — Packet
Preserved file SHA-256
61a270d401e5ebef2ab5c8bf5571d44088d531804eb623be28d533fabba3a6d4Indexed text · page 170
Show all pagesO’Connor Memorial Park Reconstruction Project HOURLY BILLING RATES As submitted in our Qualification package to the Township of West Orange on December 3, 2024, following are our municipal billing rates: PROFESSIONAL ENGINEER SENIOR PROJECT MANAGER, ENGINEERING SENIOR DESIGNER DESIGNER INSPECTOR ENGINEERING TECHNICIAN PROFESSIONAL LAND SURVEYOR SENIOR PROJECT MANAGER, SURVEYING PROJECT SURVEYOR SURVEYING TECHNICIAN PARTY CHIEF INSTRUMENT PERSON TECHNICAL TYPIST $ $ $ $ $ $ $ $ $ $ $ $ $ 190.00 165.00 125.00 95.00 105.00 85.00 170.00 150.00 135.00 105.00 110.00 95.00 75.00
File revisions (1)
- Sep 29, 2026
61a270d401e520,766,830 bytes