Town CrierWest Orange, New Jersey
← Back to search

Packet · Dec 9, 2025

Township Council Meeting — Packet

Preserved file SHA-256b84bd976c74fa60b8bd16db70de86ca0f796eb566ef6a9a6feebaaf04d147f6d

Indexed text · page 71

Show all pages
Page 71

The amount of the Performance and Payment Bond and the amount of the Bid Bond will be based ‘on the total amount of trees scheduled to be planted at time of award. The planting shall be completed by March 15, 2026. The Township will provide a list of locations with up 200 trees to be planted with specific tree quantities per species to the awarded vendor prior to commencement of work. The bid price should take in consideration that any of the species from list of trees might be used or not. Several planting periods may occur during this time frame. It is the Township's option if it chooses to award the unit prices for additional work. Hard plastic protective root barrier to be installed at least 24” in depth afong curb or sidewalk as directed. See picture for example. After bid is awarded contractor to provide specifications of product that will be used. BB

File revisions (1)