Packet · Jan 6, 2026
Township Council Meeting — Packet
dbf6a54c5ed9a44fde11ac98e8c29999b8ebc639604cbf2b02e8de3ce7dbe0fbIndexed text · page 114
Show all pages7-26 RFP for Luddington Road - Sidewalk Panel Replacement PROPOSALS RECEIVED ON: 12/5/2025 1 2 3 4 5 Boswell Inc. Hackensack, NJ CME Associates Howell,NJ Greenman-Pedersen Inc. Morris Plains,NJ* PS&S LLC. Warren,NJ Suburban Consulting Engineers Inc. Flanders,NJ Amount Amount Amount Amount Amount No Response No Response Awarded By Township of West Orange on: TASK DESCRIPTION 1 Land Surveying Services $5,950.00 $8,000.00 $7,920.00 2 Civil Engineering Services $21,000.00 $11,500.00 $36,020.00 $4,040.00 Bidding Services 3 Construction Administrative Services Proposal Total without Construction Inspection Proposal Total with Construction Inspection $12,550.00 $12,000.00 $11,960.00 $26,950.00 $39,500.00 $19,500.00 $31,500.00 $47,980.00 $59,940.00 - *Greenman-Pedersen Inc.'s proposal includes the services of a Structural Engineer. The two other responsive parties failed to mention the need for structural investigation and adherence to structural design standards. GPI has conducted a site visit and has demonstrated the most appropriate qualifications and services for this project. -
File revisions (1)
- Sep 29, 2026
dbf6a54c5ed919,422,688 bytes