Town CrierWest Orange, New Jersey
← Back to search

Packet · Jan 6, 2026

Township Council Meeting — Packet

Preserved file SHA-256dbf6a54c5ed9a44fde11ac98e8c29999b8ebc639604cbf2b02e8de3ce7dbe0fb

Indexed text · page 54

Show all pages
Page 54

TOWNSHIP OF WEST ORANGE 25 LAKESIDE AVENUE, WEST ORANGE, N.J. 07052 DEPARTMENT OF ENGINEERING SUSAN McCARTNEY Mayor Tel/Fax: (973) 325-4160 Email: Engineering@westorange.org ZAYIBETH CARBALLO Director/Municipal Engineer REQUEST FOR INFORMATION NO. 1 TO: To All Prospective Consultants FROM: Zayibeth Carballo, Director of Engineering/Municipal Engineer PROJECT: Luddington Road – Sidewalk Panel Replacement DATE: November 20, 2025 Additional information regarding the existing culvert and sewer system was requested. Question: “Is there any culvert information that can be provided, even the Township storm sewer mapping of area will be helpful”. ➢ Response: The enclosed maps and drawings are being provided for your reference. Drawing 1. Alternate Outlet Tunnels Thru First Mountain Drawing 2. Record of Ramp Portal at Easterly Entrance of Luddington Rd. Tunnel Drawing 3. Details of Ramp Portal at East Entrance to Luddington Rd. Tunnel, 10/12/31 Drawing 4. Details of Ramp Portal at East Entrance to Luddington Rd. Tunnel, 10/31/31 Also, see link to the Township’s Stormwater Information page on our website: Link: https://www.westorange.org/1862/Stormwater-Information Please be advised that the deadline for submitting proposals has been changed from December 1st, 2025 to Friday, December 5th, 2025 on or before 10AM. ZYC/tb AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org

File revisions (1)