Town CrierWest Orange, New Jersey
← Back to search

Packet · Jan 20, 2026

Township Council Meeting — Packet

Preserved file SHA-25648d99827ac0e6a228dfef9b1f62e97e50b4a30f08e31a6ff07fcb4dd04e6e746

Indexed text · page 13

Show all pages
Page 13

October 2024 New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement WHEREAS, the State may award Subrecipient funds to finance the Project ("Project Fund") pursuant to the applicable federal and state law; and WHEREAS, Subrecipient and the State desire to specify the conditions applicable to the financing of the costs of the Project (“Project Costs”) out of the Project Fund and the obligations of the Subrecipient and the State with respect to the Project; and NOW, THEREFORE, for and in consideration of the mutual covenants contained herein, and pursuant to all federal, state, and local laws and ordinances, the Subrecipient and the State hereby agree as follows: 1. Definitions As used in this Agreement, the following terms are defined in the manner indicated below: 1.1 Local Public Agency (“LPA”): The contracting agency that is the subrecipient of Federalaid funds administered through the NJDOT. 1.2 FHWA: Federal Highway Administration. 1.3 USDOT: United States Department of Transportation 1.4 Useful Life of the Project: the period of time assigned to the project for purposes of determining a repayment schedule or reimbursement in the event of default. 1.5 Responsible Charge: A full time public employee of the Subrecipient, who is not a consultant, and is responsible for the Project. 1.6 Construction Engineering: construction related design services including review of contractor’s working drawings, responding to contractor questions regarding design, and reviewing design changes. 1.7 Construction Inspection: Subrecipient is responsible for ensuring that the project is being inspected on a full time basis throughout construction of the project. Federally funded construction projects must be built and inspected in accordance to the pertinent federal and state requirements and contract documents. 1.8 Standard Specifications: the NJDOT Standard Specifications for Road and Bridge Construction, including all Baseline Document Change (“BDC”) Announcements. The Standard Specifications are incorporated into this Agreement by reference. The Subrecipient shall follow, and cause and ensure all contractors and consultants follow, all applicable provisions of the Standard Specifications. 1.9 Period of Performance: the period of time during which the Subrecipient is to complete

Page 13

nd ensure all contractors and consultants follow, all applicable provisions of the Standard Specifications. 1.9 Period of Performance: the period of time during which the Subrecipient is to complete the activities described herein and to incur and expend approved funds. 2. Description of Project – Scope of Work A detailed Project description is included in the Project Scope of Work and a detailed Cost Estimate are attached to this Agreement. 2

File revisions (1)