Packet · Jul 7, 2026
Township Council Meeting — Packet
c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786Indexed text · page 1008
Show all pages182-26 May 13, 2026 Zayibeth Carballo, PE, PLS, PP Municipal Engineer Department of Engineering Township of West Orange 60 Main Street West Orange, NJ A/E SERVICES PROPOSAL FOR: Interior Alterations for Female Police Locker Expansion & Lactation Room Police Building West Orange, NJ 1. Project Description: a. Interior alterations to an existing second floor space to accommodate new Female Police Locker Room and a separate Lactation Room. See attached Block Diagram. b. Project to Generally Include: i. Selective demolition ii. New suspended ceiling iii. Partitions iv. Doors, Frames & Hardware v. Supply and return air vi. Exhaust fan(s) per IMC vii. LED Lighting and switch circuits viii. Outlet receptacles / GFIC ix. Emergency Lighting x. Exit lights xi. Sprinkler head locations xii. Fire Alarm signaling devices xiii. Millwork: Space for under-counter refrigerator & Microwave xiv. Hot and cold water w/ tempering valve xv. Floor drain, hand sink xvi. Lockers suitable for Police xvii. Floor and wall finishes xviii. Barrier Free features as can be accomplished 2. A/E Services a. PRELIMINARY DESIGN, RESEARCH, FIELD PHASE i. Field Work and Documentation of Existing Conditions ii. Code Research including accessibility iii. Preliminary Design iv. Meet with Township v. Revisions per Township's Comments b. CONSTRUCTION DOCUMENTS PHASE i. Based on approved Design Development Documents and any further adjustments in the scope and quality of the project or in the budget, prepare Construction Documents for approval by Township. HERBST-MUSCIANO, LLC Architecture &
nts for approval by Township. HERBST-MUSCIANO, LLC Architecture & Planning New Jersey Certificate of Authorization AC 830 611 Main Street, Second Floor, Boonton, New Jersey 07005 Tel 973 538 3815 Fax 973 538 4095 www.herbstmusciano.com
File revisions (1)
- Sep 29, 2026
c399b70b6d21122,934,801 bytes