18. 19. 20. 21. will be allowed the Contractor for corrective measures required by the Engineer for delays to the work caused by failure to comply with this provision. It shall be the Contractor's responsibility to assure that all excavation and backfilling for all subsurface installations including those of the utility companies, shall be done in accordance with the Specifications, including restoration of road surface until such time as the removal of existing pavement is necessary for reconstruction of the road. Failure of the Contractor to take proper action to correct any defective work, materials, operations and/or maintenance of traffic, all as specified herein, within the time specified by the Engineer, will be cause for the Engineer to halt work and have same done by others at the expense of the Contractor with no extension of contract time permitted. CONTRACTOR'S EMPLOYEES The Contractor shall be represented on the project site at all times when work is in progress by an experienced superintendent. Only skilled foremen and workmen shall be employed on work requiring special qualifications. CLEANUP During the progress of the work, the Contractor shall keep the site in a generally neat condition. Lunch papers, bottles, lumber cutoffs, drinking cups and like rubbish shall be removed from the site daily. The work shall be cleaned up as the various portions of the project are completed. Upon the completion of the work and before acceptances and final payment shall be made, the Contractor shall, except as otherwise expressly directed or permitted in writing, clean and remove from the sites and adjacent property all surplus and discarded materials, rubbish and temporary structures. He shall restore in an acceptable manner all property which has been damaged during the prosecution of the work and leave the whole in a neat and presentable condition. There shall be no extra payment for cleanup, said costs to be included in the prices bid for the various items. EXCAVATED AND WASTE MATERIAL Unless otherwise directed by the Engineer, the Contractor shall be responsible, at his own cost and expense, for the removal from the site of the work, as well as disposal in a manner meeting all requirements of law, of all excess excavated material and all other waste material generated during the performance of the Contract. NOTICE TO RESIDENTS It shall be

Page 178

disposal in a manner meeting all requirements of law, of all excess excavated material and all other waste material generated during the performance of the Contract. NOTICE TO RESIDENTS It shall be the sole responsibility of the Contractor to notify any resident at least 24 hours in advance when access to this driveway or property will be restricted. The notice shall be in writing and shall state the date, reason and approximate length of time of the inconvenience. GR-5

File revisions (1)