DIVISION 100 — GENERAL PROVISIONS SECTION 101 — GENERAL INFORMATION 101.03 TERMS THE FOLLOWING TERMS ARE CHANGED. actual cost: The computed cost using calculations of direct labor, labor fringe benefits, indirect labor costs, insurance, materials, extraordinary expenses, equipment, profit, overhead, and subcontractors. See 104.03.08. Completion. THE FOLLOWING ITEM IS ADDED 4. The Township of West Orange has passed resolution to accept the project and issue final payment. Contract Time. Contract time begins upon the issuance of the notice to proceed. Department. Township of West Orange, as created by law, acting through duly authorized representatives, such representatives acting within the scope of the particular duties delegated to them. Full Traffic Access. All work is complete to allow safe unencumbered use of the final paved portion of roadway throughout the project including but not limited to striping, RPMs, rumble strips, highway lighting, and traffic signals as determined by the RE. ME. The intent and meaning are changed to: West Orange Township Engineer or his duly authorized representative. RE. The intent and meaning is changed to: West Orange Township Engineer or his duly authorized representative. Specifications. The compilation of provisions and requirements for the performance of prescribed work contained in the Standard Specifications, as supplemented by the Supplemental Specifications and Special Provisions, as modified by addenda (which before receipt of bids are posted on the bid notice webpage, See Section 101.04). 4. Standard Specifications. 2019 New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction, approved for general application and repetitive use. 2. Supplemental Specifications and General Provisions. Approved additions and revisions to the Standard Specifications plus the revisions and additions applicable to an individual Project. State. The intent and meaning are changed to: Township of West Orange. THE FOLLOWING TERMS ARE ADDED. Commissioner. The intent and meaning are changed to: Township of West Orange. Construction Operations Completion Date. The date of acceptance that all construction work has been completed to the satisfaction of the RE as outlined in Section 108.19. Township. Township of West Orange, as created by law, acting through duly authorized

Page 184

eptance that all construction work has been completed to the satisfaction of the RE as outlined in Section 108.19. Township. Township of West Orange, as created by law, acting through duly authorized representatives, such representatives acting within the scope of the particular duties delegated to them. Engineer. The intent and meaning are changed to: The West Orange Township Engineer or his duly authorized representative. Notice to Proceed. Written notice provided by the Township to the Contractor to authorize the start of construction operations.

File revisions (1)