Show all pagestesting reveals a failure of the Work to comply with the requirements of the Contract, or with respect to the performance of the Work, with laws, ordinances, rules, regulations, or orders of any public authority having jurisdiction, the Contractor shall bear all costs thereof, including the Township's additional services made necessary by such failure. If tests reveal no such failure, the Township will bear such costs, and a Supplementary Agreement will be negotiated. 105.04 PLANS AND SPECIFICATIONS DELETE THIS SUBSECTION IN ITS ENTIRETY AND REPLACE WITH THE FOLLOWING: The Contract Documents are essential parts of the Contract, and a requirement occurring in one is as binding as though occurring in all. All components are complementary and describe and provide for the general completion of the Project. The Contractor shall keep one set of Plans, Standard Specifications, Supplemental Specifications and General Provisions, and Standard Details available on the Project site at all times. In case of discrepancy, calculated dimensions will govern over scaled dimensions; Plans will govern over Specifications; Contract Documents will govern over Working Drawings, Right-of-Way Plans will govern over Plans when setting monuments; and Supplemental Specifications will govern over Standard Specifications. 105.07 COOPERATION WITH UTILITIES 105.07.01 Working In The Vicinity Of Utilities A. _ Initial Notice. THE FOLLOWING IS ADDED: Bidders are advised to verify the above information as its accuracy and completeness is not guaranteed by the Township. E. Damage. THIS SUBPART IS REPLACED WITH THE FOLLOWING: The Contractor shall protect, support, and secure all in-place utility facilities so as to avoid damage to them and any interruption of service. The Contractor shall not temporarily move existing or completed utility facilities without the Utility(s) written consent, and the facilities shall be as safe and permanent at completion as they were before the Contractor's involvement. In the event the Contractor damages a utility facility, including property service connections, the Contractor shall notify the Utility(s) immediately. The Utility(s) may complete the repairs or allow the Contractor to complete the repairs, with the Contractor responsible for any applicable time and expense. Should the Contractor, for its own convenience, cause the Utility(s) to incur
irs or allow the Contractor to complete the repairs, with the Contractor responsible for any applicable time and expense. Should the Contractor, for its own convenience, cause the Utility(s) to incur costs or delay the Utility(s), or incur costs without prior written approval of the Resident Engineer, the Contractor shall be responsible for these costs and delays. SECTION 107 — LEGAL RELATIONS 107.01 LEGAL JURISDICTION 107.11 RISKS ASSUMED BY THE CONTRACTOR 107.11.01 Risks 1. Damage Caused by the Contractor. THE FOLLOWING IS ADDED AFTER THE FIRST PARAGRAPH: The Contractor agrees that he shall have no right to nor shall he make any claim whatsoever for damage or additional compensation by reason of the engineer revising the stage construction or the
File revisions (1)
- Sep 29, 2026
c399b70b6d21122,934,801 bytes