Show all pages204.06 DISPOSAL All materials, whether hazardous or non-hazardous shall be disposed of in accordance with all laws and provisions and all Federal, State, County, and local regulations. The Contractor shall ensure that all waste is properly characterized. The Contractor shall comply with the disposal requirements. The contractor shall submit waste facility applications and acceptance documentation, and fee payment requirements to the Engineer at least 15 days before planned removal of regulated material. Submit to the Engineer a bill of lading for each truckload of regulated material removed from the Project Limits. If the material being transported is classified as non-hazardous, it is legally considered a solid waste, (ID 27), and, as such, the transporter hauling the waste must be a New Jersey registered solid waste transporter in accordance with N.J.A.C. 7:26-1 et. seq. Soils destined for recycling or beneficial use are not considered ID 27 waste and thus, do not require registered transporters. All hazardous waste must be shipped in accordance with the U.S. Department of Transportation guidelines as stated in 49 C.RR. 171-179, N.J.A.C. 7:26-3.0 et seq., and contaminated soils material must be shipped in accordance with N.J. Solid Waste Regulations, applicable radioactive and medical waste regulations, and applicable local regulations, Hazardous waste shipments must be properly containerized, labeled, and manifested prior to leaving the site. All disposal transporters for regulated materials must be licensed by the appropriate regulatory agency or agencies to transport the type of waste being hauled. The transportation and maneuver of materials is expected to be completed in a safe and responsible fashion, in accordance with all local, State and Federal guidelines. The Contractor shall provide manifests for all materials sent to each respective disposal facilities. The Contractor shall obtain required federal, state, and local permits for excavation and storage of contaminated material. Permits shall be obtained at no additional cost to the Owner. The disposal of materials and debris is regulated under the Solid Waste Management Act (NJSA 13:1 E-1) and is governed by NJAC 7:26 et seq. The Contractor shall dispose of the material and debris according to the solid waste management plan developed by the solid waste management district of origin.
1) and is governed by NJAC 7:26 et seq. The Contractor shall dispose of the material and debris according to the solid waste management plan developed by the solid waste management district of origin. Proper documentation from the disposal facility shall be submitted to the Engineer and/or representative. Provide copies of all paperwork including hazardous and non-hazardous manifests, final weight tickets, and waste/shipping documents within seven days of shipment from the work site to the Engineer and/or representative. 204.07 MEASUREMENT AND PAYMENT Measurement for loading, haulage and disposal shall be based on certified scale at licensed disposal facility. No payment will be made under this item for disposal of materials covered in other sections of the Contract Documents. No payment will be made for the disposal of the overlying hot mix asphalt. Disposing of contaminated soil will be measured by the ton. Payment shall not be made until the contractor has furnished the Engineer with a certificate from an approved recycling facility or a tipping certificate from an approved landfill. Payment will be made under: Item Pay Unit LOAD, HAULAND DISPOSE OF CONTAMINATED SOIL TON (IF AND WHERE ORDERED) No payment will be made for permits, fees, handling and transportation and any cost for same shall be included in the item for disposing of contaminated soil. No payment will be made for stockpiling and reuse of the excavated material. 26
File revisions (1)
- Sep 29, 2026
c399b70b6d21122,934,801 bytes