Packet · Jul 7, 2026
Township Council Meeting — Packet
c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786Indexed text · page 208
Show all pagesDIVISION 300 — SUBBASE AND BASE COURSES SECTION 301 — SUBBASE AND BASE COURSES THE FOLLOWING IS ADDED: Subbase shall be constructed using existing on-site granular soils as approved and directed by the RE or Engineer. SECTION 302 — AGGREGATE BASE COURSE THE FOLLOWING IS ADDED: The Contractor shall submit as-built quantities with each payment invoice, each payment cycle. The sum of the quantities submitted for payment will be the measured quantity and the final contract quantity. It is the responsibility of the Contractor to review the as-built measurement with the RE prior to submitting the partial payment invoice. Individual/Separate payment for DENSE-GRADED AGGREGATE BASE COURSE shall not be made at pavement repair strips along curb-lines, beneath concrete sidewalks/driveways, beneath Hot Mix Asphalt Driveways, drainage pipe trenches, at set/reset castings or reconstructed drainage structures. Individual/Separate Payment for DENSE-GRADED AGGREGATE BASE COURSE shall only be made at locations of full depth reconstruction indicated on the plans or as directed in the field. Any other locations where Dense Graded Aggregate is specified or detailed as a bedding or backfill material shall be included in the various unit bid price items. All applicable unit bid price in this section shall include Excavation, Unclassified, pavement removal and disposal of all materials in order to construct the proposed improvements in accordance with the plans and specifications, including but not limited to DENSE-GRADED AGGREGATE BASE COURSE where full depth base repair or reconstructed road sections are indicated on the plans. THE FOLLOWING IS ADDED: Dense Graded Aggregate Base Course shall be place at the direction of the Engineer in areas where existing subbase material is unstable, or unsuitable for supporting the new pavement structure. 302.04 MEASUREMENT AND PAYMENT THE FOLLOWING ITEMS ARE ADDED: Item Pay Unit DENSE-GRADED AGGREGATE BASE COURSE, 6” THICK (IF AND WHERE DIRECTED) CUBIC YARD 28
File revisions (1)
- Sep 29, 2026
c399b70b6d21122,934,801 bytes