Packet · Jul 7, 2026
Township Council Meeting — Packet
c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786Indexed text · page 216
Show all pagesInterlocking Concrete Pavement Institute Construction Tolerances for Segmental Concrete Pavements Setting Bed Materials Joint Widths Construction Tolerances land paving slabs [Sand setting bedsJoint width between adjacent for concrete paversunits (See Figure I) 1/16 in. to 3/16 in. [Attribute Segmental Concrete Paving) Products & Characteristics Construction Placement &| ‘Surface Tolerances Joint or bond lines ‘All segmental concrete paving} products: Horizontal deviation Maximum 41/2 in. horizontal] deviation from either side of al 50-ft. string line pulled over aj joint or bond line Laying Pattern Concrete Pavers: {90 degree herringbone \Surface smoothness| |All segmental concrete paving} products: Variation in height between adjacent units (lippage) Maximum 1/8 in. ‘Surface flatness |All segmental concrete paving| products: Surface tolerance 43/8 in. over 10 ft, Inoncumulative —— > Joint width Concrete paving unit unit | Concrete paving Figure 1. Conerete paving unit cross section defining joint width 606,04 MEASUREMENT AND PAYMENT THE FOLLOWING PAY ITEMS ARE ADDED: Pay Item CONCRETE SIDEWALK, 4” THICK CONCRETE SIDEWALK, REINFORCED, 6° THICK HOT MIX ASPHALT DRIVEWAY, 2” THICK DETECTABLE WARNING SURFACE THE FOLLOWING IS ADDED: New or resetting of Concrete/Clay Modular Pavers will be measured by the square yard. Square Yard cost to include labor in removing, storing and cleaning existing block, excavation, DGABC base course, plus 36 Pay Unit SQUARE YARD SQUARE YARD SQUARE YARD SQUARE YARD
File revisions (1)
- Sep 29, 2026
c399b70b6d21122,934,801 bytes