Town CrierWest Orange, New Jersey
← Back to search

Packet · Jul 7, 2026

Township Council Meeting — Packet

Preserved file SHA-256c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786

Indexed text · page 223

Show all pages
Page 223

SECTION 612 — SIGNS 612.02 MATERIALS THE FOLLOWING IS DELETED FROM THE MATERIALS LIST. Non-Breakaway Sign Supports 911.02.03 THE FOLLOWING IS ADDED: F. | Constructing Anchor, Hinge, Bracket and Coupling Assemblies. At least 10 days before beginning the work, submit the manufacturer's installation guide and installer's certification to the RE. Ensure that the installer is certified by the manufacturer. Ensure that the manufacturer's representative is present during the foundation pour and the installation of the first sign. Install anchor, hinge, bracket and coupling assemblies according to the manufacturer's recommendations. The RE may require the system manufacturer's representative to be present at all times during the installation to provide on-site technical support. 612.04 MEASUREMENT AND PAYMENT THE FOLLOWING ITEMS ARE ADDED: Pay Item Pay Unit REGULATORY AND WARNING SIGN SQUARE FEET GUIDE SIGN, TYPE GA, STEEL “U" AND SQUARE TUBE POST SUPPORTS UNIT The contractor shall be responsible for coordination with the West Orange Police Department for traffic operations and parking prohibitions during construction. The Police Department shall be notified 72 hours in advance when requesting an officer for traffic control. 43

File revisions (1)