Town CrierWest Orange, New Jersey
← Back to search

Packet · Jul 7, 2026

Township Council Meeting — Packet

Preserved file SHA-256c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786

Indexed text · page 225

Show all pages
Page 225

SECTION 653 — GAS 653.01 DESCRIPTION THE FOLLOWING IS ADDED: The Contractor shall coordinate all work with the local utility authority. The utility company is responsible for all inspection and testing. Separate payment shall not be made for Reset Gas Valve Box. Shall be included under Hot Mix Asphalt 9.5M64 Surface Course, 2” Thick. 45

File revisions (1)