Packet · Jul 7, 2026
Township Council Meeting — Packet
Preserved file SHA-256
c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786Indexed text · page 225
Show all pagesSECTION 653 — GAS 653.01 DESCRIPTION THE FOLLOWING IS ADDED: The Contractor shall coordinate all work with the local utility authority. The utility company is responsible for all inspection and testing. Separate payment shall not be made for Reset Gas Valve Box. Shall be included under Hot Mix Asphalt 9.5M64 Surface Course, 2” Thick. 45
File revisions (1)
- Sep 29, 2026
c399b70b6d21122,934,801 bytes