Town CrierWest Orange, New Jersey
← Back to search

Packet · Jul 7, 2026

Township Council Meeting — Packet

Preserved file SHA-256c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786

Indexed text · page 228

Show all pages
Page 228

Separate payment shall not be made for FERTILIZING AND SEEDING, TYPE A-3. Payment for FERTILIZING AND SEEDING, TYPE A-3 shall be included under the various bid items in sections 606 and 607. SECTION 809 — MULCHING 804.04 MEASUREMENT AND PAYMENT DELETE THE FOLLOWING ITEMS: THE FOLLOWING IS ADDED: Separate payment shall not be made for STRAW MULCHING. Payment for STRAW MULCHING shall be included under the various bid items in sections 606 and 607. SECTION 811 — PLANTING 811.01 DESCRIPTION This Section describes the requirements for furnishing, delivering, and installing plants. 811.02 MATERIALS Provide materials as specifies - 917.01 Topsoil ‘ Fertilizer, . 917.02.02 Pulverized Limeston 917.02.03 Mulch .... 917.04 Plant Material 917.08 Antidesiccant. . 917.09.02 i . 917.09.03 917.09.04 917.10.G.2 . 919.08 Provide wire staples made of No. 25 plain iron wire that are formed into a U shape, 1 inch wide and 12 inches long. 811.03 CONSTRUCTION 811.03.01 Planting A. Furnishing, Delivering, Installing, and Caring for Plants. Submit to the RE the current Materials Questionnaire Form for landscaping material, as specified in 106.04, 30 days before delivery with a copy to the Office of Landscape Architecture in the Bureau of Landscape Architecture and Environmental Solutions. Handle and pack plants to prevent injuries during transit. Do not dump or drop plants while unloading. Protect the roots of all plants from freezing or desiccating by heeling-in, watering, covering or keeping shaded, or placing in a climate controlled building or trailer. 48

File revisions (1)