Packet · Jul 7, 2026
Township Council Meeting — Packet
c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786Indexed text · page 232
Show all pagesNotify the Office of Landscape Architecture 3 days before the date plant establishment and maintenance work will be performed. Failure to care for, maintain, or replace material that is missing or not alive and healthy both on and off site in each year of the Plant Establishment and Maintenance for the period specified in the Special Provisions will be cause for the Department to access the bond and contact the bonding company to complete this work. 811.04 MEASUREMENT AND PAYMENT THE FOLLOWING ITEMS ARE ADDED: Pay litem Pay Unit SMALL DECIDUOUS TREE, 6” DIA. (IF AND WHERE DIRECTED) UNIT SECTION 820 - CONTRACT ALLOWANCE 820.01 DESCRIPTION This Section describes the requirements for contract allowance. 820.02 PROCEDURE The Schedule of Prices includes a Pay Item for Contract Allowance for changes in the scope of Work. There is no guarantee that any of these funds will need to be used during the course of the Work. 820.02.01 Changes in the Scope of Work and Allowance for Unforeseen Conditions. The Township will address changes in the scope of work as follows: A change in the scope of work is a change that causes the work to substantially differ in kind or nature from the original proposed construction. The Municipality may make payment for a change in the scope of work whether the change directly causes a change in the character of the work or causes other work to become significantly different in character. Efficiencies or inefficiencies resulting from minor increases or decreases in quantities of work are not a change in the scope of work. If a change in the scope of the work results in a decreased cost to perform the work, the Township will revise the price to reflect this reduced cost. For changes in the scope of work, the Township will base the modification on the difference between what the actual cost to perform the work of the Item or portion thereof involved would have been if there were no change, and the actual cost of performing the work or portion of work as changed. The modification shall only apply to the portion of the work for an Item actually affected by the change. No work is to be performed under CONTRACT ALLOWANCE without written authorization from the Engineer. 52
File revisions (1)
- Sep 29, 2026
c399b70b6d21122,934,801 bytes