Packet · Jul 7, 2026
Township Council Meeting — Packet
Preserved file SHA-256
c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786Indexed text · page 234
Show all pagesDIVISION 900 — MATERIALS SECTION 902 — ASPHALT 902.02.03 Mix Design THE FOLLOWING IS ADDED TO THE FIRST PARAGRAPH: Unless otherwise approved by the RE, only one source of supply for hot mix asphalt surface course may be used on the project. SECTION 909 — DRAINAGE 54
File revisions (1)
- Sep 29, 2026
c399b70b6d21122,934,801 bytes