Town CrierWest Orange, New Jersey
← Back to search

Packet · Jul 7, 2026

Township Council Meeting — Packet

Preserved file SHA-256c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786

Indexed text · page 392

Show all pages
Page 392

NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT PREVAILING WAGE RATE DETERMINATION County - ESSEX Craft: Dockbuilder/Pile Driver PREVAILING WAGE RATE 05/01/26 Foreman W63.51 B54.49 7118.00 Foreman (Concrete Form W62.41 Work) B41.14 7103.55 Journeyman 'W55.23 B54.49 7109.72 Journeyman (Concrete 'W54.27 Form Work) B41.14 795.41 Craft: Dockbuilder/Pile Driver APPRENTICE RATE SCHEDULE INTERVAL PERIOD AND RATES Yearly 22.09 27.62 35.90 44.18 Benefits 35.92 for all intervals Ratio of Apprentices to Journeymen -* * When there are 4 or fewer Dockbuilders/Pile Drivers on a job, no more than 1 may be an apprentice. When there are 5 or more Dockbuilders/Pile Drivers, there may be 1 apprentice for every 5 Dockbuilders/Pile Drivers. Craft: Dockbuilder/Pile Driver COMMENTS/NOTES APPRENTICE RATE SCHEDULE FOR CONCRETE FORM WORK ONLY: INTERVAL PERIOD AND RATES Yearly 21.71 27.14 35.28 43.42 Benefits 27.99 for all intervals NOTE: The following shall be required for type of work indicated- - There shall be one foreman and four journeymen on all land pile driving rigs. As part of the crew, one may be an apprentice. - There shall be one foreman and two journeymen on self-contained hydraulic driving rigs. As part of the crew, one may be an apprentice. - There shall be one foreman and two journeymen when driving sheeting with an excavator. As part of the crew, one may be an appprentice. - When utilizing a drill rig to install Auger cast piles there shall be one foreman and two journeymen. As part of the crew, one may be an apprentice. - There shall be one foreman and one journeyman on drilled or bored soldier piles. - There shall be one foreman and not less than one journeyman per rig on all drilled shaft and caissons. - There shall be one foreman and not less than one journeyman per rig on all earth retention tie-back and anchors. - There shall be one foreman and three joruneymen for driving of piles 60 feet or less. As part of the crew, one may be an apprentice. 5/8/2026 Page 17 of 71

File revisions (1)