Town CrierWest Orange, New Jersey
← Back to search

Packet · Jul 7, 2026

Township Council Meeting — Packet

Preserved file SHA-256c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786

Indexed text · page 459

Show all pages
Page 459

TERRITORY NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT ENTIRE STATE PREVAILING WAGE RATE DETERMINATION OPERATING ENGINEERS Rates Expiration Date : Effective Dates: 07/01/2025 Rate Fringe Total 56.59 40.40 96.99 CLASSIFICATIONS: Steam Generator or Boiler Stone Spreader Tamping Machine (vibrating ride-on type) Temporary Heating Plant (Nelson or other type, including proprane, natural gas, and flow-type units) Water or Sprinkler Truck Welding Machine (gas, diesel, or electric convertor, of any type) Welding System - Multiple (rectifier transformer type) Wellpoint Systems (including installation by bull gang and maintenance) Effective Dates: 07/01/2025 Rate Fringe Total 63.54 40.40 103.94 CLASSIFICATIONS: Helicoptor Pilot/Engineer Effective Dates: 07/01/2025 Rate Fringe Total 68.22 40.40 108.62 CLASSIFICATIONS: Cranes, Derricks, Pile Driver (all types), 100 tons and over and TOWER CRANE with boom (including jib and/or leads) 140 ft and over Effective Dates: 07/01/2025 Rate Fringe Total 67.22 40.40 107.62 CLASSIFICATIONS: Cranes, Derricks, Pile Driver (all types), 100 tons and over and TOWER CRANE with boom (including jib and/or leads) from 100 ft. to 139 ft. 03/03/2026 Page 12 of 52

File revisions (1)