Show all pagesalready performed. If it shall become absolutely necessary to perform work at night or on Sunday, the Engineer shall be informed at least twenty-four (24) hours in advance of the beginning of performance of such work. Only such work shall be done at night as can be done satisfactorily and in a first class manner. Good lighting and all other necessary facilities for carrying out and inspecting the work shall be provided and maintained at all points where such work is being done. 10. CONTRACTOR'S OFFICE The Contractor shall not be required to maintain an office at the site of the work during the period of construction. Copies of the Contract and working drawings and of the specifications shall be maintained at the project site by the Contractor at all times while work is progressing. 11. RESIDENT ENGINEER'S OFFICE It will not be necessary for the Contractor to construct or maintain an office for the sole use of the Resident Engineer. 12. SANITARY, WATER SUPPLY AND ELECTRICAL ENERGY REQUIREMENTS The Contractor shall provide at convenient places on or near the work proper sanitary accommodations. They will be subject to the inspection of the Engineer and shall at all times be constructed and maintained in a manner satisfactory to them and their use shall be strictly enforced. The Contractor shall make their own arrangements for obtaining the electrical energy and a water supply necessary for construction purposes. 13. PUBLIC SAFEGUARDS The Contractor agrees to conduct the work at all times in such a manner that public travel shall not be inconvenienced needlessly, nor shall it be wholly obstructed at any point. The Contractor further agrees to be responsible for all legal notices and signals to the public of the state of the roads while the work is in progress, providing watchmen, barricades, red lights, danger and warning signs and such other precautions necessary to protect life and property in accordance with the "Manual on Uniform Traffic Control Devices". 14. STORAGE OF MATERIALS Materials shall be stored so as to insure the preservation of their quality and fitness for the work. When considered necessary, they shall be placed on wood platforms and covered, or stored in a suitable building as
as to insure the preservation of their quality and fitness for the work. When considered necessary, they shall be placed on wood platforms and covered, or stored in a suitable building as directed by the Engineer. Stored material shall be located so as to facilitate prompt inspection. 15. BARRIERS The Contractor will be responsible for the satisfactory repair and maintenance of all fences, walls, driveways, barriers crossed or damaged by them during the course of construction. 16. PROPERTY MARKERS DISTURBED The Contractor shall, at their own expense, retain the services of a licensed surveyor to replace property markers on or adjacent to privately owned property which have been disturbed during the course of construction. GR-3
File revisions (1)
- Sep 29, 2026
c399b70b6d21122,934,801 bytes