Packet · Jul 7, 2026
Township Council Meeting — Packet
c399b70b6d21cd73c2a263bb0d6533e88c75c50265595edd8343a2f833d7a786Indexed text · page 883
Show all pagesIn locations where pavers are set with the pedestrian area construction tolerances are to be met. The following are the tolerances published by the Interlocking Concrete Pavement Institute as a result of the project identified below: https://www.access-board.gov/research/completed-research/dimensional-tolerances/introduction Interlocking Concrete Pavement Institute Construction Tolerances for Segmental Concrete Pavements Setting Bed Joint Widths Construction Tolerances Materials Sand setting beds Joint width between adjacent 1/16 in. to 3/16 in. for concrete pavers units and paving slabs (See Figure I) Attribute Segmental Concrete Paving Construction Placement & Products & Characteristics Surface Tolerances Joint or bond lines All segmental concrete paving Maximum ±1/2 in. horizontal products: Horizontal deviation deviation from either side of a 50-ft. string line pulled over a joint or bond line Laying Pattern Concrete Pavers: 90 degree herringbone Surface smoothness All segmental concrete paving Maximum 1/8 in. products: Variation in height between adjacent units (lippage) Surface flatness All segmental concrete paving ±3/8 in. over 10 ft., products: Surface tolerance noncumulative 606.04 MEASUREMENT AND PAYMENT THE FOLLOWING PAY ITEMS ARE ADDED: Pay Item Pay Unit CONCRETE SIDEWALK, 4” THICK SQUARE YARD CONCRETE SIDEWALK, REINFORCED, 6” THICK SQUARE YARD HOT MIX ASPHALT DRIVEWAY, 2” THICK SQUARE YARD DETECTABLE WARNING
CED, 6” THICK SQUARE YARD HOT MIX ASPHALT DRIVEWAY, 2” THICK SQUARE YARD DETECTABLE WARNING SURFACE SQUARE YARD RESET PAVERS SQUARE YARD THE FOLLOWING IS ADDED: HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 58 of 76
File revisions (1)
- Sep 29, 2026
c399b70b6d21122,934,801 bytes