Packet · Oct 13, 2026
Township Council Meeting — Packet
69fbd132c52abb0a21c0ee6505e903071791b1b5ad2f7729ffef122f0dace386Indexed text · page 236
Show all pagesDescription Appropriation Authorization Down Payment (xvii) Replacement of the Vincent Pond walkway with a permanent stone walkway per NJDEP; $ 100,000 $ 95,000 $ 5,000 10 years (xviii) Replacement of the existing concrete panels on top of a culvert that runs underneath Luddington Road to address erosion; $ 225,000 $ 213,750 $ 11,250 20 years $ 690,825 (including the $390,000 NJ Clean Fleet Grant) $ 300,825 $0 10 years $ 365,500 $ 18,500 $ 8,201,086 $ 346,250 (xix) Installation of EV charging stations and ADA compliant parking spaces at the West Orange Public Library; and (xx) Section 20 Costs. $ TOTALS: (b) 384,000 $10,318,504 Useful Life The improvements and purposes set forth in Section 3(a) above shall also include, as applicable, all engineering and design work, surveying, construction management services, construction planning, preparation of plans and specifications, permits, bid documents, construction inspection and contract administration, environmental testing and remediation, and all work, materials, equipment, labor and appurtenances necessary therefor or incidental thereto. (c) The estimated maximum amount of bonds or notes to be issued by the Township for said improvements and purposes is $8,201,086. (d) The estimated cost of said improvements and purposes to the Township is $10,318,504, the excess amount thereof over the estimated maximum amount of bonds or notes to be issued therefor are the Down Payments in the amount of $346,250 now available for said improvements and purposes from the Township’s Capital Improvement Fund and the Grants.
File revisions (3)
- Oct 13, 2026
69fbd132c52a12,742,509 bytes - Oct 12, 2026
c5a992557a5c12,608,326 bytes - Oct 10, 2026
bb10047a9f0c12,199,472 bytes