Packet · Oct 13, 2026
Township Council Meeting — Packet
69fbd132c52abb0a21c0ee6505e903071791b1b5ad2f7729ffef122f0dace386Indexed text · page 67
Show all pagesAGREEMENT BETWEEN THE TOWNSHIP OF WEST ORANGE AND CFM CONSTRUCTION INC. FOR THE EMERGENCY REPAIR AT SHORT HILLS PUMP STATION 275-26 THIS AGREEMENT, made this 13th day of October, 2026 BETWEEN: Township of West Orange 66 Main Street West Orange, New Jersey 07052 Hereinafter Referred to as the “Township” AND: CFM Construction, Inc. 5 Bay Street Stirling, NJ 07980 Hereinafter referred to as “Contractor.” WHEREAS, pursuant to N.J.S.A. 40A:11-6 and N.J.A.C. 5:34-6.1, in the case of emergencies that affect the public health, safety and welfare, any contract may be negotiated or awarded for the Township of West Orange without public advertising for bids; and WHEREAS, on February 9, 2026, an inspection at the Short Hills Pump Station, located at 111 Old Short Hills Road, revealed an imminent health hazard due to only one pump being operational, and an imminent failure hazard of the only operational pump due to no emergency power being provided to the Short Hills Pump Station; and WHEREAS, pursuant to the Local Public Contracts Law, Emergency Contracts, N.J.S.A. 40A:11.6a the Municipal Engineer on February 13, 2026, notified the Purchasing Agent of the need to perform an emergency repair at the Short Hills Pump Station; and WHEREAS, to expedite the work and to perform the emergency repair of the Short Hills Pump Station to protect public health and safety an emergency contract shall be issued to CFM Construction, Inc., as they are familiar with the required improvements and are readily available to perform the emergency work. NOW, THEREFORE, in consideration of the terms, conditions and stipulations hereinafter set forth, it is mutually agreed by and between the parties: 1. EMERGENCY WORK ALREADY PERFORMED In accordance with N.J.S.A. 40A:11.6a, certain emergency work has already been performed by the Contractor: a. Grease removal from wet well with by Oswald Enterprises utilizing a vactor truck; b. Engineering design of the emergency upgrades; c. Temporary metering of the influent sewage flow to determine the existing pump flow rate and total dynamic head; d. Determination that the pumps purchased by the Township are correctly sized for the pump station; e. Installation of temporary electric pump alternating with the existing pump and utilizing the existing pump control system; f. Payment of PSE&G fees for the service upgrade and temporary service;
File revisions (3)
- Oct 13, 2026
69fbd132c52a12,742,509 bytes - Oct 12, 2026
c5a992557a5c12,608,326 bytes - Oct 10, 2026
bb10047a9f0c12,199,472 bytes