g. PSE&G’s installation of a new utility pole and transformers for the 480 volt service upgrade; h. Pumps/Mixer Control Panel received and placed inside pump station building; and i. Automatic Transfer Switch received and placed inside pump station building. The total payment due in accordance with Section 5 of this Agreement, for the work already performed, is $202,600.00. 2. EMERGENCY WORK TO BE PERFORMED Contractor shall perform the following additional emergency services: a. New electrical construction for the entire pump station, including new 480 volt electrical service upgrade, distribution panels, transformer, new lighting, new receptacles, and new electric heating; b. New natural gas fueled stand-by generator with automatic transfer switch to replace inoperative diesel powered single pump motor drive; c. New ductile iron pump suction piping with isolation valves and new connections to the wet well; d. New ductile iron pump discharge piping, check valves, isolation valves, flow meter and discharge header connected to the existing force main at the wall inside the dry well. e. Construction of pump bases and installation of Wilo dry pit submersible pumps, previously purchased by the Township; f. New submersible mixer installed in the wet well to keep the solids in suspension as the sewage is being pumped; g. New Duplex Pump and Mixer Control panel with PLC, VFDs and pressure transducer for pump operation including a backup float system for secondary operation and alarms. h. New aluminum wet well access hatch with safety grate; i. Bypass pumping with external electric pump and stand-by diesel pump with automatic controls, connected to the existing bypass connection to the force main; j. Cleaning of wet well, high pressure water blasting and epoxy coating interior surfaces. k. Painting of dry well walls and pump station building interior walls; l. Start up, testing and training of operating personnel. The design drawings for the Short Hills Pump Station Rehabilitation, prepared by Van Cleef Engineering Associates, LLC, a subcontractor of Contractor, is attached hereto as “Exhibit A.” 3. ADDITIONAL NECESSARY WORK Vibrational testing of all pumps shall be conducted to confirm that the pumps are performing in accordance with the manufacturer's design standards and provide start date within 30 days of completion. 4. CONSIDERATION Due to the emergency nature

Page 68

ducted to confirm that the pumps are performing in accordance with the manufacturer's design standards and provide start date within 30 days of completion. 4. CONSIDERATION Due to the emergency nature of the Agreement, the services will be performed expeditiously on an as-needed basis, until the emergency conditions are resolved. The expenses will be kept to a minimum, while mitigating damages as efficiently as possible. The estimated cost for the sewer pump station repairs is $880,000.00. This estimate was calculated as follows:

File revisions (3)