Packet · Oct 13, 2026
Township Council Meeting — Packet
69fbd132c52abb0a21c0ee6505e903071791b1b5ad2f7729ffef122f0dace386Indexed text · page 78
Show all pagesCONTINUATION SHEET Page 2 of 2 APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's signed Certification, is attached. In tabulation below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. A ITEM No. B DESCRIPTION OF WORK Engineering & Non-Electric Construction 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 Engineering - Design & Construction Services PSE&G Fees - Temp Service & 480V Upgrade Field Investigation - Flow & TDH Measurements Set up & maintain emergency bypass pumping Demolition & disposal of exist mechanical equip. Construction of concrete piers for pumps Installation of Wilo pumps on concrete supports Pipe, fittings, plug & check valves, flowmeter mat. Installation of pump suction & discharge headers Supply and install new dry well sump pump Cleaning & coating DW & PS bldg w/epoxy paint Cleaning & coating WW interior with epoxy paint Supply and install submersible mixer in wet well Supply and install wet well aluminum hatch Construction of stand-by generator concrete pad Supply and install gas stand-by generator & ATS Electrical Construction Installation of temporary electrical service Wiring of bypass pumping equiqment & controls Demolition and disposal of exist. electrical equip. Installation of underground service conduits Service equipment and grounding materials Installation of service equipment and grounding Wiring of stand-by generator and ATS Wet well wiring Dry well wiring Supply, install & wire Pumps/Mixer Control Panel Power wiring Lighting Startup and testing Vibration Analysis and report Total Contract C PROJECT: Short Hills Pump Station Emergency Repairs D E F APPLICATION NO.: APPLICATION DATE: PERIOD TO: PROJECT NO.: G WORK COMPLETED MATERIALS TOTAL COMP. PERCENT (%) SCHEDULED FROM PREV. THIS PRESENTLY AND STORED COMPLETED VALUE APPLICATIONS PERIOD STORED TO DATE TO DATE (D+E) (Not in D or
ERIOD TO: PROJECT NO.: G WORK COMPLETED MATERIALS TOTAL COMP. PERCENT (%) SCHEDULED FROM PREV. THIS PRESENTLY AND STORED COMPLETED VALUE APPLICATIONS PERIOD STORED TO DATE TO DATE (D+E) (Not in D or E) (D+E+F) (G/C) 618,400.00 154,500.00 154,500.00 25.0% 97,500.00 72,000.00 72,000.00 73.8% 27,600.00 27,600.00 27,600.00 100.0% 7,500.00 7,500.00 7,500.00 100.0% 75,000.00 37,500.00 37,500.00 50.0% 30,000.00 0.0% 20,000.00 0.0% 25,000.00 0.0% 45,000.00 0.0% 40,000.00 0.0% 8,500.00 0.0% 42,000.00 0.0% 70,800.00 2,400.00 2,400.00 3.4% 35,000.00 0.0% 7,500.00 0.0% 12,000.00 0.0% 75,000.00 7,500.00 7,500.00 10.0% 261,600.00 48,100.00 48,100.00 18.4% 8,000.00 8,000.00 8,000.00 100.0% 5,800.00 2,900.00 2,900.00 50.0% 11,500.00 0.0% 17,000.00 0.0% 23,600.00 0.0% 35,600.00 0.0% 17,000.00 0.0% 11,500.00 0.0% 23,000.00 0.0% 60,200.00 37,200.00 37,200.00 61.8% 23,000.00 0.0% 17,000.00 0.0% 5,400.00 0.0% 3,000.00 0.0% 880,000.00 202,600.00 202,600.00 23.0% H 1 9/28/2026 9/25/2026 C470 I BALANCE RETAINAGE TO FINISH (If Variable (C-G) Rate) 463,900.00 25,500.00 37,500.00 30,000.00 20,000.00 25,000.00 45,000.00 40,000.00 8,500.00 42,000.00 68,400.00 35,000.00 7,500.00 12,000.00 67,500.00 213,500.00 2,900.00 11,500.00 17,000.00 23,600.00 35,600.00 17,000.00 11,500.00 23,000.00 23,000.00 23,000.00 17,000.00 5,400.00 3,000.00 677,400.00
File revisions (3)
- Oct 13, 2026
69fbd132c52a12,742,509 bytes - Oct 12, 2026
c5a992557a5c12,608,326 bytes - Oct 10, 2026
bb10047a9f0c12,199,472 bytes