Packet · Oct 27, 2026
Township Council Meeting — Packet
b34f73d179d0e68ca53811a404f8effa9042c0be32a673e92b686bd42f2cb3f9Indexed text · page 105
Show all pagesFIXED FEE CALCULATION PROJECT: NJDOT TAP 2025 W Orange Twp Pleasantdale Streetscape PE CONSULTANT: Colliers Engineering & Design AGREEMENT OR CAM NO. TP-806 PREPARED BY: DATE: Christopher Iacono 8/14/2026 EVALUATE PROJECT SPECIFICS: Directions: Prime Consultant will use Total Project Design Cost (or Task Order Design Cost) for the SIZE criteria Each Subconsultant will assign points for SIZE, COMPLEXITY, DURATION, & DEGREE OF RISK based on its specific project tasks. POINTS RATING SMALL - Total Fee (Project Design Cost) < $1,250,000 15 15 LARGE - Total Fee (Project Design Cost) > $1,250,000 20 SIMPLE - Limited Scope of Work; Deck Patching, Resurfacing, Restoration, Inspection, Concept Development Services 10 STANDARD - Moderate Scope; Rehabilitation, New, or Reconstruction 15 COMPLEX - Multi-disciplined, Highly Specialized, or Major Unusual 20 STANDARD - Appropriate Schedule 15 AGGRESSIVE - Designers Schedule Reduced > 10 % 20 LEVEL 1 - Low Risk of Claims; Studies, Surveys, Landscape, Inspections 20 LEVEL 2 - Average Risk of Claims; Standard Complexity or Level 1 with High Public Exposure 30 LEVEL 3 - High Risk of Claims; Hazardous, Experimental, or Bonus/Penalty Clauses 40 SPECIFICS CRITERIA SIZE: COMPLEXITY: DURATION: DEGREE OF RISK: 15 15 30 TOTAL RATING = 75 CALCULATE FEE: PROJECT SPECIFICS FACTOR (Total Rating /100) = 0.75 FEE FACTOR ( Project Specifics Factor x 0.30) = 0.225 DIRECT LABOR COSTS $ 10,361.52 TOTAL FEE (Direct Labor Costs x Fee Factor) = $ 2,331 VERIFY THAT FEE FALLS WITHIN RANGE OF 6% TO 15%: Fixed Fee Calculation Page 1 Revised 04/22/2014
File revisions (3)
- Oct 29, 2026
b34f73d179d07,514,922 bytes - Oct 25, 2026
fb28c7f156b27,514,933 bytes - Oct 24, 2026
bab8ed2d60c97,514,578 bytes