Packet · Oct 27, 2026
Township Council Meeting — Packet
b34f73d179d0e68ca53811a404f8effa9042c0be32a673e92b686bd42f2cb3f9Indexed text · page 149
Show all pagesDescription Appropriation Authorization Down Payment Useful Life (xvi) Replacement of the existing retaining wall along Pleasant Valley Way; $ 225,000 $ 213,750 $11,250 20 years (xvii) Replacement of the Vincent Pond walkway with a permanent stone walkway per NJDEP; $ 100,000 $ 95,000 $ 5,000 10 years (xviii) Replacement of the existing concrete panels on top of a culvert that runs underneath Luddington Road to address erosion; $ 225,000 $ 213,750 $ 11,250 20 years $ 690,825 (including the $390,000 NJ Clean Fleet Grant) $ 300,825 $0 10 years $ 365,500 $ 18,500 $ 8,201,086 $ 346,250 (xix) Installation of EV charging stations and ADA compliant parking spaces at the West Orange Public Library; and (xx) Section 20 Costs. $ TOTALS: (b) 384,000 $10,318,504 The improvements and purposes set forth in Section 3(a) above shall also include, as applicable, all engineering and design work, surveying, construction management services, construction planning, preparation of plans and specifications, permits, bid documents, construction inspection and contract administration, environmental testing and remediation, and all work, materials, equipment, labor and appurtenances necessary therefor or incidental thereto. (c) The estimated maximum amount of bonds or notes to be issued by the Township for said improvements and purposes is $8,201,086. (d) The estimated cost of said improvements and purposes to the Township is $10,318,504, the excess amount thereof over the estimated maximum amount of bonds or notes to be issued therefor are the Down Payments in the amount of $346,250 5 #95178364.1 168182.012
File revisions (3)
- Oct 29, 2026
b34f73d179d07,514,922 bytes - Oct 25, 2026
fb28c7f156b27,514,933 bytes - Oct 24, 2026
bab8ed2d60c97,514,578 bytes