Town CrierWest Orange, New Jersey
← Back to search

Packet · Oct 27, 2026

Township Council Meeting — Packet

Preserved file SHA-256b34f73d179d0e68ca53811a404f8effa9042c0be32a673e92b686bd42f2cb3f9

Indexed text · page 71

Show all pages
Page 71

TABLE OF CONTENTS I. PRELIMINARY ENGINEERING SCOPE OF WORK Activity ID Activity Name Utility Engineering 3035 Prepare Utility Base Plans 3045 Send Utility Verification Request Letter 3055 Identify and Analyze Utility Risks 3080 Conduct Subsurface Utility Engineering 3985 Update Utility Risk Assessment Plan Survey & Base Mapping 3015 Prepare Control Survey Report 3020 Conduct Topographic Survey 3025 Prepare Base Maps Engineering Design 3006 Prepare & Submit PE Complete Streets Checklist 3012 Develop Landscape Architectural Design 3030 Prepare Horizontal & Vertical Geometry 3070 Prepare Preliminary Roadway Plans 3085 Prepare Preliminary Drainage Design 3090 Determine Traffic Engineering Facility Locations 3130 Update Preliminary Detour and Construction Staging Plans 3135 Prepare Construction Cost Estimate Environmental Studies & Public Involvement 3300 Initiate Cultural Resources (Section 106) Process 3305 Conduct Cultural Resources Survey 3310 Prepare Cultural Resources Survey Report 3320 Address Comments on Cultural Resources Survey Report 3765 Conduct Ecology Study 3840 Conduct Hazardous Waste Study 3865 Hold Public Information Center 3874 Execute PE Public Involvement Action Plan (PIAP) 3890 Prepare Certified Categorical Exclusion (CCE) Document Preliminary Engineering Documentation 3160 Prepare Draft Preliminary Engineering Report 3165 Finalize Project Plan 3185 Develop Final Design Public Involvement Action Plan II. COST PROPOSAL III. SUB CONSULTANT PROPOSALS Page 2 2 3 3 3 4 4 5 5 5 6 6 7 7 9 9 10 10 10 10 11 11 11 11 12 12 12 12

File revisions (3)