• • • • • The Township will review and approve property-owner notification/right-of-entry letters prior to field survey activities requiring access adjacent to private property. Utility impacts will be evaluated based on verified existing facilities and the preliminary design. Up to three (3) minor utility relocations are assumed, including preliminary coordination with affected utility owners. Adjustments to existing utility structures and appurtenances necessary to accommodate proposed improvements are also anticipated. Detailed utility relocation design, final relocation plans and agreements, and construction-phase utility coordination are not included in PE. Targeted subsurface utility engineering (SUE) consisting of up to five (5) test holes is included as described under Activity 3080. Right-of-way acquisition is not anticipated. Species-specific threatened and endangered species surveys, archaeological investigations, mitigation design, geotechnical investigations, and other services not specifically identified herein are not included unless subsequently authorized. Township Progress Reviews M&S will provide progress plans, exhibits, and other applicable design materials to the Township for review at key milestones during Preliminary Engineering, including the following: • following completion of the Survey and Base Mapping, supplemented with applicable SUE information as it becomes available • following completion of Activity 3130 – Update preliminary Detour and Construction Staging Plans and prior to preparation of the construction cost estimate under Activity 3135 • prior to the Public Information Center under Activity 3865. Materials for the Public Information Center will be provided to the Township a minimum of three (3) weeks prior to the meeting to allow for review and comment. SCOPE OF WORK UTILITY ENGINEERING Activity 3035 – Prepare Utility Base Plans M&S will review base mapping and observed surface utility features within and adjacent to the project limits to establish the base plans for the utility verification request. The plans will be developed from the project survey, field-observed features, and any applicable mark-outs observed in the field. This task also includes a field visit to create a photo log to verify changes to the existing utilities. Activity 3045 – Send Utility Verification Request Letter M&S will prepare and

Page 74

ved in the field. This task also includes a field visit to create a photo log to verify changes to the existing utilities. Activity 3045 – Send Utility Verification Request Letter M&S will prepare and distribute Utility Verification Request Letters and Utility Base Plans to seven (7) utility owners licensed to operate within the project limits. Utility owners will be requested to verify existing facilities; provide available record or as-built information; identify abandoned facilities, planned improvements, easements, and known operational constraints; and provide corrections or supplemental information, as applicable. M&S will review utility-owner responses and coordinate with the utility owners to clarify discrepancies between available records, field-observed facilities, project survey information, and utility-owner information to the extent practical during Preliminary Engineering. Verified information will be incorporated into the Utility Base Plans, as appropriate. 2

File revisions (3)