The Utility Base Plans will be used to identify potential conflicts between existing utilities and the proposed roadway, sidewalk, ADA, drainage, traffic, lighting, landscape, and streetscape improvements. Potential conflicts will be advanced for utility verification and coordination under subsequent activities. Where the precise horizontal and vertical locations of underground utilities cannot be established from available information and additional information is necessary to evaluate a specific potential conflict, targeted SUE investigations may be performed under Activity 3080. Detailed utility relocation design is not included in this activity. Activity 3055 – Identify and Analyze Utility Risks M&S will review the preliminary design and verified utility information to identify potential utility conflicts and evaluate risks to project cost, schedule, constructability, and design. M&S will coordinate with affected utility owners to determine whether conflicts can be avoided or minimized through design refinements and, where necessary, establish preliminary utility accommodation requirements for advancement during Final Design. For purposes of this proposal, up to three (3) utility relocations and up to three (3) utilities with surface features requiring adjustment to accommodate proposed grades and improvements are assumed. M&S will perform preliminary coordination with the affected utility owners to establish the anticipated relocation requirements, including applicable clearances, access and operational constraints, sequencing considerations, and anticipated lead times. M&S will also identify existing manholes, valve boxes, handholes, utility castings, and similar facilities requiring adjustment to accommodate proposed improvements and grades. M&S Utility Team will assist the Lighting Design Team in coordinating with PSE&G regarding the conceptual pedestrian-scale decorative lighting layout and preliminary service requirements. PSE&G is anticipated to develop the detailed lighting layout based on conceptual fixture locations established during Preliminary Engineering. It is assumed that five (5) utility coordination meetings will be required for the three (3) utilities with potential conflicts, consisting of three (3) meetings with PSE&G and two (2) meetings with the other affected utilities. Unresolved utility conflicts and anticipated relocation

Page 75

hree (3) utilities with potential conflicts, consisting of three (3) meetings with PSE&G and two (2) meetings with the other affected utilities. Unresolved utility conflicts and anticipated relocation requirements will be documented for advancement during Final Design. Final utility relocation design, utility-specific construction plans and specifications, utility agreements, and incorporation of final utility relocation designs into the Contract Documents are not included in Preliminary Engineering. Activity 3080 – Conduct Subsurface Utility Engineering M&S will perform Subsurface Utility Engineering (SUE) at selected locations to verify the horizontal and vertical location of existing subsurface utilities where necessary to evaluate potential conflicts with the proposed improvements. M&S will identify and prepare a plan depicting the proposed test hole locations and coordinate the SUE investigation with a qualified SUE contractor. For purposes of this proposal, up to five (5) test holes are assumed. The SUE contractor will perform the test holes and prepare a SUE Test Hole Report documenting the results. M&S will review the results, update the existing utility mapping as appropriate, and incorporate the verified utility information. Activity 3985 - Update Utility Risk Assessment Plan M&S will prepare and update the Utility Risk Assessment Plan based on information received from the utility companies, the results of the SUE investigations performed under Activity 3080, and the advancing Preliminary Engineering design. The updated plan will be used to document and address 3

File revisions (3)