Packet · Oct 27, 2026
Township Council Meeting — Packet
b34f73d179d0e68ca53811a404f8effa9042c0be32a673e92b686bd42f2cb3f9Indexed text · page 76
Show all pagesidentified utility risks and support preparation of the preliminary roadway and construction staging plans. M&S will inform the PM of any new project-specific utility risks or changes to previously identified utility risks. SURVEY & BASE MAPPING Malick & Scherer, P.C. (M&S) will perform conventional ground survey and base mapping along Pleasant Valley Way. A temporary shadow vehicle and/or local police/flagger may be required to protect the survey crew and maintain traffic. For this proposal, temporary lane interruptions, if required, are assumed to be permitted by the County and Township between 9:00 AM and 3:00 PM, Monday through Friday. Survey limits will extend along Pleasant Valley Way from 300 feet south of Greenwood Avenue to 100 feet north of Kenz Terrace, up to 10 feet beyond the existing right-of-way, and approximately 100 feet along intersecting side streets from the Pleasant Valley Way centerline. Survey will include topographic, drainage, and sanitary sewer features, including pipe sizes, materials, and invert elevations where accessible. Activity 3015 – Prepare Control Survey Report M&S will prepare a Primary Survey Report in accordance with applicable sections of the Procedures Manual and Article 44 of the Consultant Contract, for submission to the County/Township if required. The report will document monuments and benchmarks used and established; NJ State Plane Coordinate System, NAD 1983 and NAVD 1988 references; survey equipment and calibration; survey procedures; software used to process and adjust observations; and data computations and results. Activity 3020 – Conduct Topographic Survey M&S will perform conventional field topographic survey and develop English-unit digital base mapping compatible with AutoCAD Civil 3D. Survey data will be processed into a Digital Terrain Model (DTM), and an ASCII point file will be prepared. Mobilization and Document Research M&S will mobilize a field crew and request relevant existing plans and documents from the County/Township. Permit and MPT Coordination M&S will coordinate roadway permit requirements and Maintenance and Protection of Traffic (MPT) services and/or local police for temporary lane interruptions. Up to three days of MPT/Police are included, as most survey work is anticipated behind the curb. Primary Control Horizontal and vertical control will be established within the project limits
ruptions. Up to three days of MPT/Police are included, as most survey work is anticipated behind the curb. Primary Control Horizontal and vertical control will be established within the project limits based on GPS observations and tied to NJ State Plane NAD 83 and NAVD 88 datums. Primary control points will include three swing ties, benchmarks will be established at approximately 500-foot intervals as required, and tie sheets will be prepared. Ground Survey Conventional survey methods will be used to obtain roadway cross sections at approximately 50-foot intervals and locate topographic features, including visible utility hardware, pole numbers, overhead wires, hydrants, manholes, catch basins, valves, and similar features. Buildings within the survey limits will be located where possible, including building lines/corners, doorway thresholds, finished floor elevations, landings, and stoops. Sidewalk joints are excluded. Significant grade breaks and curb depressions will be located. 4
File revisions (3)
- Oct 29, 2026
b34f73d179d07,514,922 bytes - Oct 25, 2026
fb28c7f156b27,514,933 bytes - Oct 24, 2026
bab8ed2d60c97,514,578 bytes