Traffic analyses will be performed utilizing Synchro traffic engineering software to evaluate existing and future operating conditions associated with the proposed improvements. Future traffic analysis will consider the following peak hour periods: • • • • Weekday AM Peak Hour Weekday Midday Peak Hour Weekday PM Peak Hour Saturday Peak Hour Each time period will be analyzed under the following conditions: • • • Existing Conditions Future No-Build (With No Proposed RRFB crossings and Existing Lane Geometry and Signal Timings) Future Build (With Proposed RRFBs and Signal Timing Adjustments (if needed) at Eagle Rock Avenue) Synchro model simulations (SimTraffic) will be run for one (1) one-hour period. The Synchro and simulation results will be utilized to report existing and future condition Level of Service (LOS), delay, and queues. It is anticipated that two iterations of the Synchro model may need to be evaluated to determine if the proposed traffic signal timings to a level acceptable by the County. M&S will prepare tables to summarize the results of the traffic analysis. Based upon the results of the traffic analyses and field investigations, M&S will prepare preliminary layouts for the proposed RRFB installations, traffic signal modifications, signing and striping improvements, and pedestrian crossing enhancements. Push button locations will be reviewed for MUTCD compliance. The traffic signal timing directive will be developed for weekday peak, weekday non-peak, and weekend time periods (or as needed based on the existing timing plans). A review of pedestrian clearance intervals will be conducted, and new pedestrian heads may be recommended as needed. Existing roadway geometry will be evaluated to determine opportunities to improve pedestrian safety, including potential lane width modifications and pedestrian refuge areas near the Greenwood Avenue crossing, while maintaining acceptable traffic operations. A sign inventory within the project limits will be prepared using street view webpages and field observations. Each sign will be documented based on MUTCD and NJDOT sign designations, size, condition, compliance and photographed. Non-standard signs will also be inventoried. Condition of existing pavement markings will be assessed. Preliminary Plans showing the existing and proposed layout of roadway signs and pavement markings will be developed in

Page 80

ll also be inventoried. Condition of existing pavement markings will be assessed. Preliminary Plans showing the existing and proposed layout of roadway signs and pavement markings will be developed in accordance with NJDOT Standard Details and guidance from the FHWA MUTCD. The existing lane geometry and marking types are anticipated to remain, as appropriate. Lane geometry modifications will be assessed at the Greenwood Ave intersection with the goal of gaining enough space for a center raised median to act as a pedestrian refuge area. This would result in the travel lanes in each direction being shifted toward the outside curb in each direction. Preliminary lighting design will include evaluation of existing lighting at each of the above-mentioned intersections, conceptual pedestrian-scale decorative lighting, preliminary lighting layouts, lighting warrant evaluations, and coordination with PSE&G regarding proposed lighting infrastructure. Preliminary photometric analyses and lighting calculations will be performed using Visual Lighting Design 8

File revisions (3)