Software, as appropriate, to establish conceptual fixture locations and spacing consistent with NJDOT requirements. Traffic engineering recommendations developed during this activity will be incorporated into the Preliminary Roadway Plans and Construction Cost Estimate. Assumptions: • • • • • • • • • • Trip generation or volume distribution for future developments will not be performed. No Traffic Control will be required to perform the set-up or takedown of the count equipment. A Traffic Impact Report is not required. No temporary signal design will be required. No geotechnical borings, investigations and reporting will be performed under PE at new traffic signal locations. It is assumed geotechnical activities for signal pole foundations will be performed in FD. Volume diagrams will not be prepared. Raw data sheets will be used for the analysis/warrants. Business driveway traffic data will not be collected. No signal operations or equipment modifications are proposed at Eagle Rock Ave except for potential timing refinements based on current traffic conditions, and installing microwave pedestrian detection devices. A County signal plan may be used as the go-by if directed by the Township. M&S will coordinate with NJDOT/County to determine preferred luminaire type, manufacturer, and model number. Activity 3130 – Update Preliminary Detour and Construction Staging Plans M&S will develop preliminary construction staging and maintenance of traffic concepts to facilitate construction while maintaining safe and efficient access for motorists, pedestrians, transit users, emergency responders, businesses, and adjacent property owners. Construction staging concepts will evaluate the sequence of proposed improvements, pedestrian detours, temporary sidewalk accommodations, maintenance of access to commercial properties and residences, coordination with utility construction, and opportunities to minimize traffic disruptions throughout construction. The preliminary staging concepts will identify anticipated construction phases, temporary traffic control requirements, business driveway access needs, and maintenance of pedestrian accessibility during construction. Potential impacts to bus stops, intersections, and pedestrian crossings will also be evaluated. Construction staging assumptions developed during this activity will be reflected in the Preliminary Roadway Plans

Page 81

impacts to bus stops, intersections, and pedestrian crossings will also be evaluated. Construction staging assumptions developed during this activity will be reflected in the Preliminary Roadway Plans and Construction Cost Estimate. Activity 3135 – Prepare Construction Cost Estimate M&S will prepare and update a Preliminary Engineering Construction Cost Estimate based on the Preliminary Roadway Plans and anticipated construction quantities. Unit prices will be based on current NJDOT bid-price information and other appropriate cost data, as necessary. The estimate will include roadway, pedestrian and ADA improvements, drainage, traffic signal, signing and striping, lighting, landscaping and streetscape amenities, utility-related work, maintenance and protection of traffic, and other anticipated construction items. Appropriate contingencies and allowances will be included for items not fully defined during Preliminary Engineering. 9

File revisions (3)