Town CrierWest Orange, New Jersey
← Back to search

Packet · Oct 27, 2026

Township Council Meeting — Packet

Preserved file SHA-256b34f73d179d0e68ca53811a404f8effa9042c0be32a673e92b686bd42f2cb3f9

Indexed text · page 84

Show all pages
Page 84

stakeholder comments with M&S for consideration in the Preliminary Engineering design and environmental documentation and will assist the Township in obtaining the anticipated Historic Preservation Commission Resolution of Support. Activity 3890 – Prepare Certified Categorical Exclusion (CCE) Document It is anticipated that the project meets the Programmatic Agreement for Approval of Certain Categorical Exclusions between the FHWA and NJDOT. M&S will assist NJDOT BEPR with preparation of the Certified Categorical Exclusion Document (CCED) by preparing Section I. General Information and Section II. Project Description and environmental constraints mapping to support the CCED. PRELIMINARY ENGINEERING DOCUMENTATION Activity 3160 – Prepare Draft Preliminary Engineering Report M&S will prepare the Draft Preliminary Engineering (PE) Report documenting the engineering, environmental, utility, and public involvement activities completed during Preliminary Engineering and the resulting design decisions and recommendations. The report will be prepared in accordance with NJDOT requirements and will include or reference the applicable environmental documentation, Preliminary Roadway Plans, technical studies and memoranda, Construction Cost Estimate, stakeholder coordination documentation, and other required supporting information for NJDOT review and advancement of the project into Final Design. Activity 3165 – Finalize Project Plan Following receipt of Preliminary Engineering review comments, M&S will coordinate with the Township and NJDOT to address applicable comments and revise the Preliminary Roadway Plans and supporting PE documentation, as appropriate. The finalized plans will incorporate accepted design refinements, stakeholder input, environmental commitments, utility coordination requirements, and other applicable revisions and will establish the approved Project Plan for advancement into Final Design. Activity 3185 – Develop Final Design Public Involvement Action Plan Colliers, as a subconsultant to M&S and under M&S' supervision, will prepare the Final Design Public Involvement Action Plan (PIAP) based on the public and stakeholder coordination completed during Preliminary Engineering. The PIAP will identify anticipated Final Design outreach activities, stakeholders, communication methods, project milestones, and opportunities for public participation and

Page 84

ng Preliminary Engineering. The PIAP will identify anticipated Final Design outreach activities, stakeholders, communication methods, project milestones, and opportunities for public participation and will address applicable comments and commitments developed during Preliminary Engineering. Colliers will submit the draft PIAP to M&S for review and address comments necessary to finalize the document. 12

File revisions (3)