Packet · Oct 27, 2026
Township Council Meeting — Packet
b34f73d179d0e68ca53811a404f8effa9042c0be32a673e92b686bd42f2cb3f9Indexed text · page 86
Show all pagesPRELIMINARY ENGINEERING COST PROPOSAL TOWNSHIP OF WEST ORANGE NJDOT Transportation Alternatives Set-Aside Program 2025 Pleasantdale Streetscape Project - Pleasant Valley Way (from 250 Feet South of Greenwood Avenue to Kenz Terrace) Township of West Orange, Essex County, New Jersey 8/20/2026 TASK # / TASK NAME 3006 Prepare & Submit PE Complete Streets Checklist 3012 Develop Landscape Architectural Design 3015 Prepare Control Survey Report 3020 Conduct Topographic Survey 3025 Prepare Base Maps 3030 Prepare Horizontal & Vertical Geometry 3035 Prepare Utility Base Plans 3045 Send Utility Verification Request Letter 3055 Conduct Utility Risk Analysis 3070 Prepare Preliminary Roadway Plans TITLE 3080 Conduct Subsurface Utility Engineering 3085 Prepare Preliminary Drainage Design 3090 Determine Traffic Engineering Facility Locations 3130 3135 Update Preliminary Detour and Construction Staging Plans Prepare Construction Cost Estimate 3160 Prepare Draft Preliminary Engineering Report 3165 Finalize Project Plan 3185 Develop FD Public Involvement Action Plan 3300 3305 Initiate Cultural Resources (Section 106) Process Conduct CR Survey 3310 Prepare CR Survey Report 3320 Address Comments on CR Survey Report 3765 Conduct Ecology Study 3840 Conduct Hazardous Waste Study 3865 Hold Public Information Center 3874 Execute PE Public Involvement Action Plan (PIAP) 3890 Prepare Certified Categorical Exclusion (CCE) Document Update Utility Risk Assessment Plan 3985 Sr. Professional PVII Principal Engr/Surveyor PV Project Engineer PIV Engineer PIII Engineer PII Engineer PI Senior Designer ETIV Survey Crew Instrument Chief/ Sr Tech Operator / Tech ETIII ETII Research Clerk TOTAL
Principal Engr/Surveyor PV Project Engineer PIV Engineer PIII Engineer PII Engineer PI Senior Designer ETIV Survey Crew Instrument Chief/ Sr Tech Operator / Tech ETIII ETII Research Clerk TOTAL HOURS 2.00 8.00 12.00 1.00 8.00 16.00 24.00 1.00 1.00 8.00 16.00 17.00 38.00 52.00 130.00 130.00 12.00 379.00 22.00 96.00 192.00 10.00 10.00 16.00 365.00 32.00 81.00 26.00 1.00 40.00 1.00 2.00 1.00 2.00 10.00 12.00 25.00 4.00 20.00 21.00 45.00 10.00 32.00 2.00 8.00 16.00 8.00 36.00 26.00 90.00 104.00 180.00 6.00 16.00 8.00 16.00 24.00 24.00 2.00 40.00 94.00 102.00 1.00 2.00 8.00 4.00 2.00 6.00 16.00 1.00 8.00 16.00 8.00 4.00 8.00 8.00 2.00 35.00 48.00 12.00 2.00 48.00 238.00 24.00 39.00 24.00 48.00 8.00 16.00 57.00 16.00 8.00 44.00 4.00 6.00 2.00 2.00 1.00 2.00 1.00 2.00 3.00 1.00 1.00 2.00 12.00 32.00 62.00 106.00 10.00 40.00 64.00 114.00 16.00 16.00 24.00 16.00 3.00 TOTAL MANHOURS 3.00 32.00 40.00 9.00 1.00 3.00 10.00 16.00 245.00 244.00 12.00 17.00 250.00 294.00 240.00 126.00 374.00 31.00 140.00 140.00 28.00 2097.00 DIRECT RATE $ 122.50 $ 99.60 $ 90.00 $ 73.60 $ 65.50 $ 50.44 $ 36.94 $ 58.75 $ 47.17 $ 38.07 $ 39.50 TOTAL DIRECT SALARY $ 1,960.00 $ 24,402.00 $ 21,960.00 $ 18,400.00 $ 19,257.00 $ 12,105.60 $ 4,654.44 $ 21,972.50 $ 6,603.80 $ 5,329.80 $ 1,106.00 $ 137,751.14 SUBTOTAL DIRECT LABOR COSTS $ OVERHEAD BASED ON NJDOT APPROVED OVERHEAD ( 99.88%) $ 137,751.14 137,585.84 FIXED FEE (22.5% X DIRECT LABOR COSTS) $ PROFESSIONAL FEE $ OUT-OF-POCKET EXPENSES $ TOTAL SUBCONSULTANT COST $ TOTAL COST $ 30,994.01 306,330.99 22,485.00 87,684.87 416,500.86 OUT-OF-POCKET EXPENSES Deed Packets & Maps MPT (Shoulder Closures) Traffic Count Processing Natural Heritage Program Data Environmental Data (EDR) Subsurface Utility Engineering (SUE) Total Expense Project Manager PVI $ SUBCONULTANTS 540.00 Richard Grubb & Associates $ $ $ $ $ $ $ $ $ $ 4,500.00 Colliers Engineering & Design 1,575.00 70.00 800.00 Total Cost for Subconsultants 15,000.00 22,485.00 $ 54,687.46 $ $ $ $ 32,997.41 87,684.87
File revisions (3)
- Oct 29, 2026
b34f73d179d07,514,922 bytes - Oct 25, 2026
fb28c7f156b27,514,933 bytes - Oct 24, 2026
bab8ed2d60c97,514,578 bytes