Town CrierWest Orange, New Jersey
← Back to search

Packet · Oct 27, 2026

Township Council Meeting — Packet

Preserved file SHA-256b34f73d179d0e68ca53811a404f8effa9042c0be32a673e92b686bd42f2cb3f9

Indexed text · page 87

Show all pages
Page 87

FIXED FEE CALCULATION PROJECT: 2025 TAP - W Orange Pleasantdale Streescape Project - PE CONSULTANT: Malick & Scherer, P.C. AGREEMENT OR CAM NO. TP-806 PREPARED BY: DATE: R. Zalewski 6/20/2026 EVALUATE PROJECT SPECIFICS: Directions: Prime Consultant will use Total Project Design Cost (or Task Order Design Cost) for the SIZE criteria Each Subconsultant will assign points for SIZE, COMPLEXITY, DURATION, & DEGREE OF RISK based on its specific project tasks. SPECIFICS CRITERIA SIZE: COMPLEXITY: DURATION: DEGREE OF RISK: POINTS RATING SMALL - Total Fee (Project Design Cost) < $1,250,000 15 15 LARGE - Total Fee (Project Design Cost) > $1,250,000 20 SIMPLE - Limited Scope of Work; Deck Patching, Resurfacing, Restoration, Inspection, Concept Development Services 10 STANDARD - Moderate Scope; Rehabilitation, New, or Reconstruction 15 COMPLEX - Multi-disciplined, Highly Specialized, or Major Unusual 20 STANDARD - Appropriate Schedule 15 AGGRESSIVE - Designers Schedule Reduced > 10 % 20 LEVEL 1 - Low Risk of Claims; Studies, Surveys, Landscape, Inspections 20 LEVEL 2 - Average Risk of Claims; Standard Complexity or Level 1 with High Public Exposure 30 LEVEL 3 - High Risk of Claims; Hazardous, Experimental, or Bonus/Penalty Clauses 40 TOTAL RATING = 15 15 30 75 CALCULATE FEE: PROJECT SPECIFICS FACTOR (Total Rating /100) = 0.75 FEE FACTOR ( Project Specifics Factor x 0.30) = 0.225 DIRECT LABOR COSTS $ 137,751.14 TOTAL FEE (Direct Labor Costs x Fee Factor) = $ 30,994 Fixed Fee Calculation Page 1 Revised 04/22/2014

File revisions (3)