ove-described Temporary Easement being as shown on a survey to be obtained by the GRANTEE as soon as the same is made available; and It is hereby agreed that: 1. All above recitations are included in this Agreement by reference. 2. The GRANTOR has good and lawful right to convey the temporary easement referenced herein.

Page 48

3. GRANTOR represents that the temporary easement is free and clear from encumbrances of record that might interfere with the scope of work reference herein. 4. GRANTEE will provide GRANTOR at least 48 hours’ notice prior to the commence of the work. 5. GRANTOR agrees, at its sole cost and expense, to waive, release, indemnify, defend against, and satisfy all claims and/or judgments, both known and unknown, and hold harmless GRANTEE, including its employees, officers, agents, servants, representatives, and officials from and against any and all claims, actions, costs, penalties, losses, damages, liabilities, judgments, demands, and expenses, including, but not limited to, attorneys’ fees and defense costs which arise out of the performance of this Agreement and any past services, provided by the Township, including, but not limited to the pump inspection and maintenance/repair of the same. 6. GRANTEE has, beyond the scope of this Agreement, no further obligations to GRANTOR regarding the subject matter of this Agreement. GRANTOR acknowledges ownership and responsibility for its sanitary sewage pump system and no further liability or continued obligations of GRANTEE with regard to same. 7. Nothing herein shall be construed to be an offer or obligation to inspect, maintain, or repair said systems, and both GRANTOR and GRANTEE acknowledge that this Agreement does not create any ongoing obligations on the part of GRANTEE beyond this one-time agreement, and its is further acknowledged that GRANTEE must not and will not perform these services TERMS OF TEMPORARY EASEMENT 1. GRANTEE is authorized to utilize GRANTOR’S property to the extent necessary (to accomplish it’s tasks as set forth herein) for ingress, egress, repair, maintenance, replacement, and storage of parts, supplies, and equipment, necessary to effectuate GRANTEE’S obligations under this Agreement. 2. GRANTOR agrees that if any disturbance or damage is caused to the subject property as a result of the GRANTEE’S exercise of the rights and privileges afforded to it under this instrument, the GRANTEE shall restore the affected area as near as practicable to its original condition, in a good workman-like manner. 3. GRANTOR agrees, acknowledges, and affirms that the temporary easement hereunder granted shall be binding upon his heirs, successors, and assigns. 4. The Temporary Easement shall expire twelve

Page 48

ner. 3. GRANTOR agrees, acknowledges, and affirms that the temporary easement hereunder granted shall be binding upon his heirs, successors, and assigns. 4. The Temporary Easement shall expire twelve (12) months after execution. NOW THEREFORE, in consideration of the sum of One ($1.00) Dollars and other good and valuable consideration paid to the GRANTOR by the GRANTEE, GRANTOR does hereby grant unto the GRANTEE, their heirs, successors and assigns a Temporary Easement to conduct emergency repairs to the sewer and/or stormwater piping located on the

Page 49

PREMISES in the area to be prescribed by the survey to be provided by the GRANTEE to the GRANTOR. IN WITNESS WHEREOF, the parties have hereunder affixed their hands and seals the day and year first above written. ____________________________ MELISSA ROBINSON ____________________________ DANA ROBINSON ATTESTED TOWNSHIP OF WEST ORANGE ______________________________ Karen J. Carnevale, R.M.C. Township Clerk STATE OF NEW JERSEY COUNTY OF ESSEX ________________________(seal) by: Susan McCartney, Mayor ss: I CERTIFY that on November ____, 2026 Melissa and Dana Robinson personally came before me and stated to my satisfaction that each person executed this instrument as their own act.

Page 50

296-26 EXHIBIT A [TO BE SUPPLIED]

Page 51

Rak Plumbing and Heating, LLC 296-26 60 Carlton Avenue | East Rutherford, New Jersey 07073 +1 973-309-0523 | Rak.plumbing.heating@gmail.com RECIPIENT: Estimate #3549 Township Of West Orange Sent on 10/09/2026 66 Main Street West Orange, New Jersey 07052 Total $75,800.00 SERVICE ADDRESS: 11 Nelson Court West Orange, New Jersey 07052 Product/Service Description Qty. Unit Price Total 1 of 4 pages

Page 52

Rak Plumbing and Heating, LLC 60 Carlton Avenue | East Rutherford, New Jersey 07073 +1 973-309-0523 | Rak.plumbing.heating@gmail.com Product/Service Description Labor / Exempt Complete Pump Station Installation: -Schedule an appointment with the homeowner and camera/locate existing sewer line -Call in for utility mark outs -File all necessary permits with Township of West Orange -Perform all excavation, trenching, and backfilling and compacting in order to install pump station pit -Cut existing sewer line in the yard and route into new pump pit and make connection -Connect discharge of new pump station to existing sewer line that runs out to the street (utilize existing sewer as a force main) -Pour concrete anti floatation ring around basin -All electrical work to be performed by licensed electrician and that includes running the conduit and wiring from the pump to the pump control panel, and from the pump control panel to the electrical panel -Pump control panel to be installed on the house near the electrical service -Connect Wifi Alarm and program -Reinstall any affected pavers, spread top soil and grass seed to any disturbed areas -Sawcut asphalt driveway in order to run electrical conduit -Patch asphalt driveway -Test all work upon completion Qty. Unit Price Total 1 $75,800.00 $75,800.00 -We are proposing to supply and install: (1) 4' wide x 11' deep fiberglass basin with 48" lockable steel hatch cover (2) PRG101M-2 Grinder pumps, 1 HP, 115 V, 1 phase, capacities of 46 GPM, heads to 50' TDH, 25' power cord (1) AE24L=4 NEMA 4X duplex alternating control panel including four floats, aux. contacts, and integral audio/ visual high level alarm (1) 48" dia. X 132" H fiberglass basin with Fiberglass anti-floatation flange with 2" side discharge. 2" Female Threaded PVC discharge coupling. (2) Guide rail assembly, including GR22-S guide rail, 1-1/4" stainless steel rails, s/s lifting chain, etc. (1) (1) 4" Unmounted Inlet Hub (1) Miscellaneous hardware and plumbing, including PVC ball valves, PVC check valves, float bracket, PVC discharge pipe etc. (1) JB70 junction box, with watertight cable connectors and 2" conduit coupling (1) WiFI Alarm ALM-2-EYE 2 of 4 pages

Page 53

Rak Plumbing and Heating, LLC 60 Carlton Avenue | East Rutherford, New Jersey 07073 +1 973-309-0523 | Rak.plumbing.heating@gmail.com Product/Service Description Qty. Unit Price Total Labor / Exempt Not included: -Tree repair/replacement and any landscaping repairs -Any unmarked utilities that may become damaged during excavation -If the pump pit specced in infeasable, to be determined by camera inspection, any change of scope of work will be re-evaluated at the video inspection/locating -Replacing the sewer line from the property to the street manhole -Any preexisting sewer conditions that exist in the sewer line from the house to the new pit, that may need to be repaired, will be additional -Asphalt repairs -Any additional work not listed above will be done at an additional cost -Complete replacement of asphalt driveway 1 $0.00 $0.00* Labor / Exempt CO - OP Resolution #0417-24 #CK-04-BERGEN #11-BeCCP Vendor#26672 1 $0.00 $0.00* * Non-taxable Total $75,800.00 This quote is valid for the next 10 days, after which values may be subject to change. Disclosure: - Demolition of existing plumbing/heating to be done by others. - All garbage produced by our firm will be disposed to an on-site dumpster provided by others. - Shower to be prepitched by others. - All fixtures to be supplied by others & received/inspected for damages by the person purchasing the fixtures. - Bathroom layout to be determined by the GC with the homeowner. - Dryer vent to be rough in by others, and dryer to be connected by others. - Roof penetrations to be flashed by others. - Blocking for pedestal sinks, wall mounted sinks, grab bars, or any other wall mounted fixtures shall be installed by others. - All digging, cutting and opening of walls/floors, and patching of walls/floors to be done by others. - Any work not included in this contract scope, will be done at an additional cost once a signed change order has been received. - Change orders shall be paid in full upon completion of the extra scope of work. New construction project payment schedule (Not applicable to change orders, repairs, or service calls) *Payments to be 40% deposit received before any work begins, an additional 30% within 3 days after rough inspection is passed, and the final 30% after final inspection is passed within 3 days - Any portion of any fee or other amount payable hereunder that is not paid

Page 53

itional 30% within 3 days after rough inspection is passed, and the final 30% after final inspection is passed within 3 days - Any portion of any fee or other amount payable hereunder that is not paid within 30 days when due will accrue interest at one and one-half percent (1.5%) per month or the maximum rate permitted by applicable law, whichever is less, from the due date until paid. 3 of 4 pages

Page 54

Rak Plumbing and Heating, LLC 60 Carlton Avenue | East Rutherford, New Jersey 07073 +1 973-309-0523 | Rak.plumbing.heating@gmail.com Signature: _____________________ Date: _____________ 4 of 4 pages