Town CrierWest Orange, New Jersey
← Back to search

Packet · Nov 10, 2026

Township Council Meeting — Packet

Preserved file SHA-25675e37671f90a719420008509ada2f0a64bcdfd13210ae90c641801425e607e41

Indexed text · page 53

Show all pages
Page 53

Rak Plumbing and Heating, LLC 60 Carlton Avenue | East Rutherford, New Jersey 07073 +1 973-309-0523 | Rak.plumbing.heating@gmail.com Product/Service Description Qty. Unit Price Total Labor / Exempt Not included: -Tree repair/replacement and any landscaping repairs -Any unmarked utilities that may become damaged during excavation -If the pump pit specced in infeasable, to be determined by camera inspection, any change of scope of work will be re-evaluated at the video inspection/locating -Replacing the sewer line from the property to the street manhole -Any preexisting sewer conditions that exist in the sewer line from the house to the new pit, that may need to be repaired, will be additional -Asphalt repairs -Any additional work not listed above will be done at an additional cost -Complete replacement of asphalt driveway 1 $0.00 $0.00* Labor / Exempt CO - OP Resolution #0417-24 #CK-04-BERGEN #11-BeCCP Vendor#26672 1 $0.00 $0.00* * Non-taxable Total $75,800.00 This quote is valid for the next 10 days, after which values may be subject to change. Disclosure: - Demolition of existing plumbing/heating to be done by others. - All garbage produced by our firm will be disposed to an on-site dumpster provided by others. - Shower to be prepitched by others. - All fixtures to be supplied by others & received/inspected for damages by the person purchasing the fixtures. - Bathroom layout to be determined by the GC with the homeowner. - Dryer vent to be rough in by others, and dryer to be connected by others. - Roof penetrations to be flashed by others. - Blocking for pedestal sinks, wall mounted sinks, grab bars, or any other wall mounted fixtures shall be installed by others. - All digging, cutting and opening of walls/floors, and patching of walls/floors to be done by others. - Any work not included in this contract scope, will be done at an additional cost once a signed change order has been received. - Change orders shall be paid in full upon completion of the extra scope of work. New construction project payment schedule (Not applicable to change orders, repairs, or service calls) *Payments to be 40% deposit received before any work begins, an additional 30% within 3 days after rough inspection is passed, and the final 30% after final inspection is passed within 3 days - Any portion of any fee or other amount payable hereunder that is not paid

Page 53

itional 30% within 3 days after rough inspection is passed, and the final 30% after final inspection is passed within 3 days - Any portion of any fee or other amount payable hereunder that is not paid within 30 days when due will accrue interest at one and one-half percent (1.5%) per month or the maximum rate permitted by applicable law, whichever is less, from the due date until paid. 3 of 4 pages

File revisions (3)